![ABB Power2 650-M46 Operation Manual Download Page 151](http://html.mh-extra.com/html/abb/power2-650-m46/power2-650-m46_operation-manual_2838027151.webp)
Operation Manual / Power2 650-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.5 Installing the cartridge group
© Copyright 2019 ABB. All rights reserved.
HZTL4066_EN
Revision A
March 2019
Installing the nozzle ring
NOTICE
Chamfering (02) on nozzle ring and turbine casing
The nozzle ring (56001) can only be fitted into the turbine casing (51000) if
both of the chamferings (02) on diameter D are aligned with one another.
Fig. 16: Installing the nozzle ring
1. Fit the lamellar sealing ring (56005) in the nozzle ring (56001). Make sure the lamellar
sealing ring is fitted correctly in the right slot (see above illustration).
2. Insert the nozzle ring into the turbine casing as far as it will go and check for correct pos-
itioning, chamfering (02).
Page
23
/
39