
1 Overview
PCS100 ESS User Manual | 2UCD190000E001 rev. J
6
10.2.2 List of User/System accounts in ABB
delivery................................................. 77
10.3 Displaying the GDM in a Web Browser ........ 78
10.4 Downloading the Event Log........................ 78
10.5 Downloading Service Information ............... 79
Commissioning ............................................ 80
11.1 Pre-Power Visual Checks........................... 80
11.2 Power Connection Checks ......................... 81
11.3 Isolation transformer check list ................... 81
11.4 Earth (Ground) Checks .............................. 81
11.5 Initial Power Up (Low Power) ..................... 82
11.6 Initial Power Up (Utility Power) ................... 82
11.7 Initial Run (No Load) ................................. 83
11.8 Load Test ................................................. 83
11.9 Documentation and Handover .................... 83
11.10 Parameters change record ......................... 84
Appendices .................................................. 85
Appendix A – GDM Menu Reference ................... 86
GDM Parameter Index ..................................... 86
GDM Parameter .............................................. 94
Appendix B – MODBUS Parameters & Error Codes
.............................................................. 130
MODBUS TCP Supported Functions .............. 130
MODBUS RTU RS-485 Supported Functions.. 130
General Status and Measurements Registers . 131
Configuration Parameters .............................. 136
Control Parameters ....................................... 139
Setpoint Status ............................................. 141
CAN IO Board Status .................................... 142
Power Module Internal Temperatures ............ 144
Rack Module Internal Temperatures .............. 146
Frequency and Voltage Envelopes’ Parameters
Grouped Parameters ..................................... 148
Modbus Error Codes ..................................... 149
Detailed Product Status Codes ...................... 150
Appendix C – Open Source Software ................. 151
Appendix D – Wiring Information........................ 151
Maximum CAN Bus Length ............................ 151
Analog AR1 and AR2 Inputs .......................... 151
Appendix E - Torque settings and Bolt order ....... 152
Appendix F – Installation requirements ............... 152
Floor Requirements ....................................... 152
Location ........................................................ 152
Dedicated Transformer .................................. 152
Appendix G – General Disclaimer ...................... 152
Appendix H – Waste Electrical and Electronic
Equipment Information (WEEE) ................ 152
Appendix I – Glossary ....................................... 153