background image

Table of Contents

 

WARNING!: 

THE OVRHTE SERIES WARRANTY IS VOIDED if the unit 
is damaged as a result of improper installation or the 
installer’s failure to verify the following conditions prior to 
installation.

 

WARNING!: 

HAZARDOUS VOLTAGES PRESENT: Improper installation 
or misapplication may result in serious personal injury 
or damage to the electrical system. Read the complete 
installation instructions before proceeding with installation. 
Remove all power to the electrical panel before installing or 
servicing the SPD.

 

WARNING!: 

IMPORTANT SAFETY INSTRUCTIONS: All work must be 
performed by licensed and qualified personnel. Follow 
applicable electrical specifications for the country the unit 
is being used in.

 

WARNING!: 

Check to ensure that a proper bond is installed between 
neutral and ground at the transformer upstream from all 
3-phase Wye, 3-phase High-Leg Delta or 2-phase OVRHTE 
series device. If the transformer is not accessible, check 
the main service disconnect/panel for the NG bond. Lack 
of a proper bond will damage OVRHTE series and void the 
warranty.

 

WARNING!: 

Do not HIPOT the OVRHTE series units or the electrical 
system to which the OVRHTE series unit is connected 
without disconnecting the OVRHTE series units conductors 
including phases, neutral and ground.

Warning!  

lnstallation by person with electrotechnical expertise only.

Warnung!  

lnstallation nur durch elektrotechnische Fachkraft.

Avertissement! 

lnstallation uniquement par des personned qualifiées 
électrotechnique.

iAdvertencia!  

La instalación deberá ser realizada únicamente por 
electricistas especializados.

Thank you for choosing the ABB 

OVRHTE series Surge Protective Device 

(SPD). We look forward to fulfilling your 

facilitywide surge protection needs.

This manual provides guidelines for the proper installation of 
the OVRHTE series of devices. Proper product selection and 
compliance with these guidelines will help your new suppression 
system provide years of reliable service. If installers are 
unsure about the facility electrical configuration or have other 
installation-related questions, it is recommended they consult 
with a qualified electrical professional.

When shortcuts are taken or installation procedures are not 
followed, the OVRHTE series may become damaged or may not 
provide adequate protection. It is extremely important to follow 
these installation procedures carefully.

Guide to installation 

and assistance

Guide to installation and assistance  . . . . . . . . . . . . . . . . . . . . 2
Pre-installation checklist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Service configurations  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Electrical connections   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2 Product manual | 

OVRHTE surge protective device

Summary of Contents for OVRHTE

Page 1: ...Type 2 SPD applications Protects facilities and equipment against the harmful effects of lightning strikes and internally generated electrical transients Includes pre wired pigtail conductors to streamline installation Features internal copper bus conduction path to minimize system impedances lowering clamping voltage and increasing protection ...

Page 2: ...isconnecting the OVRHTE series units conductors including phases neutral and ground Warning lnstallation by person with electrotechnical expertise only Warnung lnstallation nur durch elektrotechnische Fachkraft Avertissement lnstallation uniquement par des personned qualifiées électrotechnique iAdvertencia La instalación deberá ser realizada únicamente por electricistas especializados Thank you fo...

Page 3: ... A model number is on the right side of the OVRHTE series unit Each model number corresponds to the configurations printed in Table 1 Model number Voltage Configuration OVRHTExx1201P 120V 1 phase 2 wire ground OVRHTExx2401P 240V 1 phase 2 wire ground OVRHTExx1202S 120 240V 2 phase 3 wire ground OVRHTExx1203Y 120 208V 3 phase Wye 4 wire ground OVRHTExx2203Y 220 380V 3 phase Wye 4 wire ground OVRHTE...

Page 4: ...o BOND CONDUCTORS FURNISHED WITH OVRHTE SERIES L1 L1 N N G N G L Figure 2 2 phase 3 wire 20 AMP 2 POLE CIRCUIT BREAKER OVRHTExx2S SERIES L1 L2 G N EARTH GROUND Xo BOND CONDUCTORS FURNISHED WITH OVRHTE SERIES L1 N L2 N G L1 L2 N G Figure 3 3 phase Wye 4 wire 20 AMP 3 POLE CIRCUIT BREAKER OVRHTExx3Y SERIES EARTH GROUND Xo BOND B N C A N G N G CONDUCTORS FURNISHED WITH OVRHTE SERIES A B C G N A B C 2...

Page 5: ...ive devices Product manual 5 Figure 6 Mounting hole detail Four 7 9 mm 3125 in holes are provided for mounting the OVRHTE Mounting 25 4 mm 1 in 101 6 mm 4 in 190 5 mm 7 5 in HUB 152 4 mm 6 in 171 5 mm 6 75 in 9 5 mm 375 in ...

Page 6: ...ces within the panelboard to connect the dry contacts leads to the user s monitoring circuits Alternatively install a junction box between the OVRHTE and the panelboard to connect dry contacts leads to user s monitoring circuits See Figure 6 Consult applicable local codes to ensure proper installation Before applying power Measure the line to line voltage at the panel to be protected and be sure i...

Page 7: ...2 5VA AC 457 0 mm 18 in of 19 1 mm 75 in nonmetallic flexible conduit and a fitting that connects to the provided 19 1 mm 75 in hub 19 1 mm 75 in x 76 2 mm 3 in nipple that connects to the provided 19 1 mm 75 in hub Standards Compliance Listed by UL to UL 1449 4th Edition for Type 2 SPD application cUL and UL1283 Compliant to IEEE C62 41 1 2002 C62 41 2 2002 and C62 45 2002 NFPA 70 NEC Article 285...

Page 8: ...hall apply ABB assumes no responsibility for any errors or omissions that may appear in this document We reserve all rights in this document and in the information contained therein Without prior written approval from ABB reproduction disclosure to third parties or use of any information in whole or in part is strictly forbidden Copyright 2016 ABB all rights reserved 072816 Model Date of purchase ...

Reviews: