![ABB MB3000 Series Installation And User Manual Download Page 12](http://html.mh-extra.com/html/abb/mb3000-series/mb3000-series_installation-and-user-manual_4214012.webp)
General Notices
Section 2 Safety Summary
6
AA003700-01 rev. G. 2.0
General Notices
Conformity Declaration
All ABB MB3000 Series FTIR spectrometers have the following conformity
certifications:
–
CB
–
CE
–
WEEE
–
TUV
–
FCC
–
FDA 21 CFR chap 1, sub chapter J.
Refer to
Appendix A, Certificates of compliance
.
Touching the optical parts of the detector (mirror) may damage the spectrometer
and it may reduce performances.
Changing the computer or instrument IP address should be done by qualified
personnel only.
Screws are easily inserted and tighten. If excessive force is required to set the
screws in place, remove the screw and retry, the screw is probably not properly
aligned.
All components, whether in transportation, operation or storage, must be in a non
corrosive environment.
Make sure to maintain a minimum of 6 inches clearance in front of heat sinks.
Always install the spectrometer on a stable, hard, levelled surface.
Do not use the equipment if any signs of damages are present. Contact ABB
service personnel.