CONFIGURATION PAGES
HMI MP53/MP56
1TNC928250M0201
46
4.4.4
Demand integration time setting
The demand integration time in FC610 are selectable from 2 s, 10 s, 5 min, 8 min, 10 min, 15 min,
20 min, 30 min and 60 mins. The integration time is calculated by the sliding method. The slid-
ing time interval is 1 second when the integration time is selected as 2 or10 seconds. When the
integration time is 5, 8, 10, 20, 30, 60 minutes, the sliding time interval is 1 minute
Level 1
Level 2
Level 3
Value range
(PARA: Parameters)
(IPAM: Integration
period of average
and maximum)
(I_IT: Integration time
of current)
2 seconds,
10 seconds,
5 minutes,
8 minutes,
10 minutes,
15 minutes,
20 minutes,
30 minutes,
60 minutes
(U_IT: Integration time
of voltage)
(F_IT: Integration time
of frequency)
(P_IT: Integration time
of power)
4.4.5
Maintenance setting
Level 1
Level 2
Level 3
Value range
(MAIN:
Maintenance)
(PCRP: 1/2 period
curves record point
*
)
30 %-70 %
(RUN: Running time)
1-65534
Off:65535 (65535)
(INSE: Insertion cycle)
1-65534
Off:65535 (65535)
*) The event curve record position refers to the position of the record point where the event
occurs in the entire event record, such as 30 %, which means that the record at the time of the
event is located at 30 % of a record.