
Note
Action
Tightening torque 4 Nm
.
Refit the 3 pcs flange
and the 3 pcs flange
gasket, using the 6 pcs
M6x20. Apply locking
liquid (Loctite 243).
18
(Change the gaskets if
necessary.)
xx0700000509
Refit the 3 pcs upper
arm sealing rings. Ap-
ply locking liquid (loc-
tite 243). Change the
sealings if necessary.
19
A Screw M6x20
B Flange
Described in section
Replacement of upper arm on page 180
Refit the 3 upper arms
using the 6 x 3 pcs
M6x40. Apply locking
liquid (loctite 243).
20
Apply locking liquid (loctite 243).
Mount new VK-covers
on the upper arms.
21
Described in section
Replacement of parallel arms on page 174
Refit all parallel arms.
22
Described in section
Replacement of telescopic shaft on
Refit the telescopic
shaft.
23
CAUTION
The base cover has sharp edges, use protective gloves.
Described in section
Replacement of base cover gasket on
Refit base cover.
24
142
Product manual - IRB 360
3HAC030005-001 Revision: U
© Copyright 2008-2018 ABB. All rights reserved.
3 Maintenance
3.5.2 Gearboxes, axes 1- 4
Continued
Summary of Contents for IRB 360-1/800
Page 1: ...ROBOTICS Product manual IRB 360 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 156: ...This page is intentionally left blank ...
Page 236: ...This page is intentionally left blank ...
Page 258: ...This page is intentionally left blank ...
Page 276: ...This page is intentionally left blank ...
Page 278: ...This page is intentionally left blank ...
Page 283: ......