![ABB Integritas Quick Start Manual Download Page 4](http://html1.mh-extra.com/html/abb/integritas/integritas_quick-start-manual_4116003004.webp)
QUICK START GUIDE
Page 4
Version 6.0
© 2021 ABB. All rights reserved.
Installation
Regulations, standards, site engineering instructions etc. take precedence over these general installation
instructions.
Step 1
-
Set External Shunt Jumper
-
0ption
The charger is factory configured for an internal shunt.
Set the Shunt Jumper to External if an external shunt is used.
1.
Remove charger rear panel—
6
screws: 3 each top and bottom.
2.
Move both Shunt Jumpers HDR11 and HDR12 to RMT (External) position—pins 2
-
3.
3.
Replace charger rear panel. Secure with 6 screws.
Tools required:
•
Wire cutters and strippers
•
Torque wrench
-
0
-
65 in
-
lb (0
-
10 Nm)
•
Screwdrivers
-
Philips and Flat
•
Cable crimpers
•
Sockets
-
5/16”, 7/16,
etc.
Jumpers in External (RMT Positions