Step 11
-
Initial Start
-
up
Rectifiers are keyed allowing only their installation into chargers of the same voltage.
1.
Verify that AC and DC connections are complete and secure.
2.
Turn on AC input breakers.
a.
External feed breaker(s)
b.
Charger AC breaker(s) (AC1 and AC2 if present)
Rectifiers will start
-
up. Then the Controller will start
-
up.
3.
Verify
4.
All rectifiers should be indicating green AC and DC LEDs with no red LEDs.
The Controller should be indicating no alarms
-
display background should be green and no red LEDs.
If alarms are present, see Troubleshooting section.
If there are no alarms, make required adjustments to the default settings on the controller for this installation.
Step 10
-
Install Rectifiers
Rectifiers are keyed for input and output voltage, allowing only their installation into compatible
chargers .
Warning:
Equipment Damage
-
Do not Install rectifiers if the Reverse Polarity LED is Red .
1.
Verify the Reverse Polarity LED is not Red and the Ready LED is Green.
If the Reverse Polarity LED is RED, reverse battery cables.
If Ready LED is not Green, verify the voltage on the battery wires
2.
Slide Rectifier firmly into a Rectifier position
-
oriented as shown.
3.
Secure Rectifier
-
thumb screws
-
top and bottom.
4.
Repeat for remaining Rectifiers.
5.
Secure empty slot fillers in each vacant Rectifier position
-
thumb screws top and bottom.
Step 12
-
Configure Controller
Verify and edit controller basic configuration parameters per site engineering instructions.
See Information: IP843G Controller Basic Operation.
IP843G Product Manual provides additional detail.