Operation Manual / A130-M.. - A145-M..
10 Taking out of operation at short notice / 10.2 Installing the replace-
ment turbocharger
© Copyright 2022 ABB. All rights reserved.
HZTL4031_EN
Rev.P
February 2022
10.2
Installing the replacement turbocharger
To enable an engine to be put back into operation quickly after a turbocharger has sustained
damage, Turbo Systems recommends having a replacement turbocharger or appropriate
spare parts available in storage. The defective turbocharger can be removed and the re-
placement turbocharger installed within a short period of time.
u
Remove defective turbocharger (see chapter
).
u
Install replacement turbocharger (see chapter
).
u
Send the defective turbocharger to a Turbo Systems service station for inspection and re-
pair.
10.3
Installing the replacement cartridge group
WARNING
Incorrect handling of a cartridge group
Incorrect handling of a cartridge group can damage the turbocharger and
cause injuries to persons.
u
Always have repairs to the cartridge group carried out by a Turbo Sys-
tems service station.
To enable an engine to be put back into operation quickly after a turbocharger has sustained
damage, Turbo Systems recommends having a replacement cartridge group available in
storage. The defective cartridge group can be removed and the replacement cartridge group
installed within a short period of time. A replacement cartridge group is ready for use imme-
diately and includes the complete bearing casing with bearing and a balanced rotor.
The repair of a cartridge group requires special tools and the expertise of a Turbo Systems
service station. The rotating parts rotate extremely quickly, and are sensitive to unbalance.
u
Remove defective cartridge group (see chapter
).
u
Install replacement cartridge group (see chapter
).
u
Send the defective cartridge group to a Turbo Systems service station for inspection and
repair.
Page
122
/
149