3
For your safety!
• Make sure that the installation room (space, divisions and
environment) is suitable for the electrical apparatus.
• Make sure that all the installation, putting into service and
maintenance operations are carried out by skilled personnel
with in-depth knowledge of the equipment.
• Make sure that all the installation, service and maintenance
operations comply with the standards and laws so as to en-
sure that the installations are constructed in accordance with
the rules of good workmanship and safety in the work place.
Responsible behaviour safeguards your own and others’ safety!
Please contact the ABB Assistance Service for any further requirements.
• Strictly comply with the instructions in this manual.
• Make sure that the rated performance of the apparatus is
not exceeded during service.
• Make sure that the personnel are provided with this manual
and are aware of all the relevant information while operating
on the apparatus.
• Pay special attention to the information in the manual high-
lighted by the following symbol:
Summary of Contents for HD4/R
Page 2: ......
Page 21: ...21 7 9 Overall dimensions 7 9 1 Fixed HD4 R 12 24 kV 630 1250 A TN 7237 Figure 9 ...
Page 22: ...22 7 9 2 Fixed HD4 R 12 24 kV 630 1250 A TN 7234 Figure 10 ...
Page 24: ...24 7 9 4 Plug in HD4 S 12 24 kV 630 1250 A TN 7236 Figure 12 ...
Page 25: ...25 7 9 5 HD4 Uniair 12 24 kV 630 1250 A TN 7235 Figure 13 ...
Page 26: ...26 7 9 6 HD4 Uniair F 12 24 kV 630 A TN 7275 Figure 14 ...
Page 27: ...27 7 9 7 HD4 Uniair 2R 12 24 kV 630 1250 A TN 7274 Figure 15 ...
Page 28: ...28 7 9 8 HD4 Uniair A 12 24 kV 630 1250 A TN 7273 Figure 16 ...
Page 29: ...29 7 9 9 HD4 UniMix F 12 24 kV 630 1250 A TN 7366 Figure 17 ...
Page 30: ...30 7 9 10 HD4 R SEC 12 24 kV 630 800 A 1VCD003536 Figure 18 ...
Page 37: ......