2
Index
1. Packing and transport
4
2. Checking on receipt
4
3. Storage
5
4. Handling
5
5. Description
6
5.1. Performance and electrical characteristics
6
5.2. Construction characteristics
7
5.2.1. Types of switch-disconnectors and
earthing switches
7
5.3. Overall dimensions
8
5.4. Construction characteristics
13
5.4.1. Switch-disconnectors
13
5.4.2. Protection classes
13
5.4.3. Main components
13
5.5. Operating mechanisms
14
5.6. Earthing switches
15
5.7. How to connect earthing switch ES 230
16
5.8. How to connect earthing switch EF 230
18
5.9. General information about SF6 gas-insulated
switchgear
20
5.10. Reference Standards
20
5.11. Interlocks
20
5.12. Switch-disconnector operating instructions
21
5.13. General information
21
5.13.1. Unit with single-spring operating
mechanism
21
5.13.2. Unit with double-spring operating
mechanism
23
5.13.3. No-load spring release procedure
25
5.13.4. Operation of units with key interlocks
26
5.13.5. Cable testing
26
5.14. Putting into service
28
5.14.1. Preparatory operations
28
6. Service and maintenance
29
6.1. General recommendations and precautions
29
6.2. Maintenance frequency
29
6.3. Inspection
30
6.4. Assistance
30
6.5. Replacing and installing new apparatus
31
6.5.1. Replacing tripped fuses
31
7. Accessories
33
7.1. VPIS voltage presence indicating systems
33
7.2. Pressure monitoring devices
34
7.3. Door lock
35
7.4. Key lock
36
7.5. Voltage presence detector and phase conformity
device
36
7.6. Spare parts, additional materials and lubricants
37
7.6.1. Spare parts
37
7.6.2. Additional materials and lubricants
37
8. Recycling
38
8.1. General aspects
38
8.2. Materials
38
9. Routine inspections
42
9.1. General information
42
9.1.1. Inspection schedule
42
Summary of Contents for GSec/IB
Page 43: ...43 ...