![ABB FPTC-02 User Manual Download Page 35](http://html.mh-extra.com/html/abb/fptc-02/fptc-02_user-manual_2723035.webp)
5
Mechanical installation
Contents of this chapter
This chapter contains a delivery checklist and instructions on installing
the module.
Necessary tools and instructions
•
Torx screwdriver (T10)
For a complete list of tools, see the applicable drive hardware manual.
Unpacking and examining the delivery
1. Open the option package.
2. Make sure that the package contains:
•
FPTC-02 module
•
STO cable
•
ATEX label (with the ATEX classification markings)
•
this manual.
3. Make sure that there are no signs of damage to any of the items.
Mechanical installation 35
Summary of Contents for FPTC-02
Page 2: ......
Page 4: ......
Page 23: ... Layout 1 1 2 4 3 XSTO2 XSTO1 XWRN XFLT Retaining clips 1 Lock 2 Hardware description 23 ...
Page 28: ...28 ...
Page 37: ...2 3 1 4 Mechanical installation 37 ...
Page 38: ...38 ...
Page 48: ...48 ...
Page 64: ...64 ...
Page 70: ...70 ...
Page 78: ...78 ...
Page 89: ...Technical data 89 ...
Page 90: ...90 Technical data ...
Page 92: ...92 Technical data ...
Page 93: ...Check the latest version of the certificate in the ABB Library Technical data 93 ...