APC - Chapter 3. Installation
18
en
Depending on the type of the bank, pass the cable inside the right hand side raceway (APCL2 and APCR) or
fix it along the central plate (APCM2). Please refer to
Figure 3.10.
APCL2
APCM2
APCR
Figure 3.10. Interconnection cable location
3.4.5.1. Master
(PIL)
APCL2
wiring
The cable is divided in three main parts: the DC supply for the fan (to DC supply unit), the step control (to the
PF controller) and special features (to a dedicated terminal).
Special features connection
DC supply connection
PF controller connection
(terminal labels: X, 15)
Figure 3.11. Master APCL2 wiring
Please revert to the schematic diagrams fitted with the bank for exact label of the wires.
3.4.5.2. Master
(PIL)
APCM2
wiring
The cable is divided in two main parts: the step control (to the PF controller) and special features (to a
dedicated terminal).