![ABB ACSM1 Series User Manual Download Page 39](http://html1.mh-extra.com/html/abb/acsm1-series/acsm1-series_user-manual_3352824039.webp)
Operation
39
3.
• If the downloading is continued, the display shows a message about it.
4.
• Downloading continues, drive is being restarted.
5.
• The display shows the transfer status as a percentage of completion.
6.
• Downloading continues.
7.
• Downloading continues, drive is being restarted.
8.
• Downloading finishes.
9.
Panel shows a text identifying the alarm and returns to the Par Backup.
Step
Action
Display
Initializing param.
restore operation
PAR BACKUP
LOC
00:00
Restarting drive
PAR BACKUP
LOC
00:00
PAR BACKUP
LOC
50%
Restoring/downloading
user set 1
Initializing param.
restore operation
PAR BACKUP
LOC
00:00
Restarting drive
PAR BACKUP
LOC
00:00
Finishing restore
operation
PAR BACKUP
LOC
ALARM 2036
RESTORE
ALARM
EXIT
LOC
Summary of Contents for ACSM1 Series
Page 1: ...ACSM1 User s Guide ACSM1 Control Panel...
Page 4: ......
Page 8: ...About the manual 8...
Page 12: ...Hardware description 12...
Page 15: ...Installation 15 Mounting template...
Page 16: ...Installation 16 Gasket...
Page 44: ...Operation 44...
Page 45: ......