7.1
Safety
▲
DANGER
⚠
7.2
Overview of installation work
The electrical installation includes the following wire and cable connections:
- “7.5 Power cables, ground cables and equipotential bonding conductor” on page 93
- “7.6 Auxiliary power, control and serial communication cables” on page 102
7.3
Cable requirements
7.4
Ground cable connection and cable shield connections
The cabinet is equipped with a ground busbar (marked PE, Protective Earth) for grounding the
armor and shields of the cables, and for the connection of the ground cable.
Hazardous voltage!
- Improper work could lead to life-threatening injury or death.
- The electrical installation must be carried out by qualified personnel according
to the site and equipment requirements, and the relevant electrical codes.
- When the electrical installation is completed, the main and auxiliary power
supply to the drive must not be switched on without the consent of the ABB
commissioning personnel.
- Take appropriate measures to prevent main and auxiliary power supply being
switched on during installation.
For information on the requirements for power cables, ground cable and
equipotential bonding conductor, see:
- Power cable specification
- Power cables engineering guideline
For information on the requirements for the auxiliary power cable and the control
cables, see the “Auxiliary power and control cables guideline”.
To identify the ground bus, see “Appendix D – Wiring diagrams”.
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......