Dosing Pump
AAO100
2 Installation
IM/DOSPMP
Rev. B
5
2.4.2 Connecting the Tubing to the Pump
Referring to Fig. 2.5:
1. Cut the end of the tubing straight across.
2. Slide union nut
A
and circlip
B
over the tubing.
3. Push the end of the tubing over nozzle
C
.
4. Ensure that O-ring
D
is seated correctly.
5. Fasten the union nut to valve
E
while pushing the tube onto the nozzle.
Fig. 2.5 Connecting the Tubing to the Pump
A
B
C
D
E
Summary of Contents for AAO100
Page 10: ...Dosing Pump AAO100 Notes 8 IM DOSPMP Rev B Notes ...
Page 11: ...Sales Service ...