Dosing Pump
AAO100
2 Installation
IM/DOSPMP
Rev. B
3
2.2 Electrical Connections
2.2.1 Dosing Pump Mains Connections
The power supply range is 100 to 230 V AC.
Referring to Fig. 2.2:
1. Connect the mains plug
A
.
2. Push the mains plug into the pump socket
B
.
3. Fasten the mains plug cover
C
.
2.2.2 Analyzer Connections
Referring to Fig. 2.3:
1. Plug the controller cable into the dosing pump
A
.
2. Cut the controller cable's Blue wire back to the outer
insulation.
3. Remove the analyzer's terminal cover plate – see Section
6.4.1. of the analyzer's User Guide (IM/AX4PH).
4. Twist the controller cable's Black and Brown wires
together and connect to terminal A10
B
.
5. Twist the controller cable's White and Grey wires together
and connect to terminal A12
C
.
6. Refit the analyzer's terminal cover plate – see Section
6.4.1. of the analyzer's User Guide (IM/AX4PH).
2.3 Dosing Pump Settings
For optimum cleaning, set the dosing pump to:
Refer
to
Section
page
for
analyzer
configuration
instructions.
Caution.
Before making any electrical connections, ensure
that the power supply is switched off.
Fig. 2.2 Dosing Pump Mains Connections
Earth
Neutral
Live
A
B
C
Fig. 2.3 Analyzer Connections
Stroke Length
100
Multifunction
Switch
External
– the AX400 pH Analyzer controls
the frequency and duration of the
cleaning cycle.
Black
Brown
White
Grey
A9
A10 C
A11 N/C
A12 N/O
A13
AX400
Terminal block A
A
B
C
Summary of Contents for AAO100