From Utility
UPS 1#
UPS 2#
I/P Breaker
I/P Breaker
I/P Breaker
Mains Breaker
Maintain Bypass for Parallel
O/P Breaker
O/P Breaker
UPS 3#
O/P Breaker
Main O/P Breaker
To Load
Mains Mechanical or static switch
17
—
16
3 .4 .5
Parallel installation operation
Up to three UPSs can be connected in parallel to
configure a sharing and redundant output power.
—
16 Parallel system
installation diagram
3 I N S TA L L AT I O N