ENG
42
9 Software
9.1 Installation
ETS
(from V.
1.3)
1. Install the panel commissioning software from the current EIB database on a PC.
2. Import the product database into the ETS.
3. Configure the unit and set the parameters.
Power-
Projekt 4.x
1. Install the panel commissioning software from the current EIB database or from the Power-
Projekt CD.
2. Configure the unit and set the parameters (see above).
The EIB database can be purchased directly from Busch-Jaeger or downloaded from the
Internet at www.busch-jaeger.de.