Aries 2000 Installation Manual v1.0
26
Step 4
Repeat steps 2 and 3 for the opposite end of the bath, but still wall side.
Step 5
Introduce the tap end upper end panel to the bath at an angle of
approx. 45 degrees, and slip the panel edge under the bath lip.
With the panel edge still under the bath lip, press the panel
forwards checking that the panel bolts line up with the panel
fixing bracket attached to the bath.
Once the panel is in place, retain the panel using the 1 x
M6 washer and 1 x M6 hex nut per bolt. (Do not tighten).
The bath and top end panels come with central locating points,
match up these points to correctly align the panel.
Note: these panels are not handed!
Once satisfied with panel
positioning, tighten both
nuts to secure the panel.
Step 6
Repeat step 5 for head end upper end panel.
Step 7
Offer the wall side upper side panel up to the bath at an angle
of approximately 45 degrees.
Insert the panel edge under the bath lip. In one motion, apply
slight upwards pressure as the panel is being pushed flat. This
will ensure the panel edge seats properly under the bath lip.
Firmly press together the 2 x fastmount fixing found at the bottom corners of the panel
(1 at each end).
Central locating points