6/1531-ANF 901 14 Uen F1 2013-11-29
59
A
PPENDIX
B
Note:
When moving from ELU31 connected to server “A” to another
ELU31 connected to server “B”. Depending when called to PP
starts and when PP starts roaming can PP not be reached.
10.1.2 Prerequisites
Make sure that the ELU31 boards, all the required cables between the
boards and the base stations have been properly installed see chapter
5 Mounting & Installation on page 22
Make sure that the correct R-state of the SW in the system as well as
FW on the ELU31 boards and base stations are installed. SW may be
verified by the pu_info command while FW R-state for the ELU31 board
and base stations are printed out with the board_sw command.
Check also that all portables have the right firmware loaded and that they
are initiated and registered in the exchange.
Check that the number of system the phone is registered to are correct.
See Direction for Use Cordless phones. Normally only one. Having only
one working site and having more then one registration can cause seri-
ously problem for other DECT phones. All invalid subscription shall be
removed.
See section DCA service and operational directions for Cordless exten-
sion.
Check that a floor plan is drawn up. On the floor plan all base stations
shall be marked out with their RFP numbers and belonging PARI values.
10.1.3 References
In this appendix references are made to following documents
10.1.4 Procedure
The following procedure shall be used when testing Mobility:
Operational Direction
Cordless extension
Command Description
Cordless extension
Parameter Description
Cordless extension
Feature Description
Cordless phone
Fault location directions
Synchronization fault for DECT fixed part
Synchronization disturbance for DECT fixed part
Faulty RFP for DECT fixed part
Installation Planning
Mobility