
5
Index of Tables and Figures
Tables:
Table 1 - Electric and Gas Heating Capacities
............................................................................. 27
Table 2 - A Cabinet Unit Clearances
............................................................................................ 29
Table 3 - B Cabinet Unit Clearances
............................................................................................ 29
Table 4 - C Cabinet Unit Clearances
............................................................................................ 29
Table 5 - D Cabinet Unit Clearances
............................................................................................ 30
Table 6 - E Cabinet Unit Clearances
............................................................................................. 30
Table 7 - Variable Speed Compressor VFD Frequency Range
.................................................... 49
Table 8 - Control Wiring
............................................................................................................... 49
Table 9 - 6-8 and 10 ton Gas Connections
.................................................................................... 50
Table 10 - 9 and 11-15 ton Gas Connections
................................................................................ 50
Table 11 - 16-25 and 30 ton
.......................................................................................................... 50
Table 12 - 26 and 31-70 ton
.......................................................................................................... 50
Table 13 - 55, 65 and 75-140 ton Gas Connections
...................................................................... 51
Table 14 - Natural Gas (ft
3
/hr) Maximum Piping Capacities
....................................................... 51
Table 15 - Propane (kBtu/hr) Maximum Piping Capacities
......................................................... 51
Table 16 - Gas Piping Supports
.................................................................................................... 52
Table 17 - Glycol Freezing Points
................................................................................................ 56
Table 18 - Standard Brazed Plate Heat Exchanger Water Connections
....................................... 57
Table 19 - SMO 254 Brazed Plate Heat Exchanger Water Connections
...................................... 57
Table 20 - Steam Coil Connection Sizes
...................................................................................... 59
Table 21 - Hot Water Coil Connection Sizes
................................................................................ 59
Table 22 - Chilled Water Coil Connection Sizes
.......................................................................... 59
Table 23 - Stages of Electric Preheat
............................................................................................ 62
Table 24 - Pin Location
................................................................................................................. 75
Table 25 - Pin Groove Location
.................................................................................................... 75
Table 26 - Acceptable Refrigeration
............................................................................................. 78
Table 27 - R-410A and R-22 Refrigerant Temperature-Pressure Chart
....................................... 79
Table 28 - ECM Condenser Fan Cycling Options
........................................................................ 81
Table 29 - Demand Signal vs. Compressor Capacity Modulation
................................................ 94
Table 30 - 6-8 and 10 ton Pre Filters
............................................................................................ 95
Table 31 - 9 and 11-15 ton Pre Filters
.......................................................................................... 95
Table 32 - 16-25 and 30 ton Pre Filters
........................................................................................ 95
Table 33 - 26, 31, and 40 ton Pre Filters
....................................................................................... 95
Table 34 - 50, 60, and 70 ton Pre Filters
....................................................................................... 96
Table 35 - 55, 65, and 75 ton Pre Filters
....................................................................................... 96
Table 36 - 90-140 ton Pre Filters
.................................................................................................. 96
Table 37 - 26, 31-50, 60, and 70 ton Preheat Filters
..................................................................... 97
Table 38 - 6-8 and 10 ton Unit Filters
........................................................................................... 97
Table 39 - 9 and 11 ton Unit Filters
.............................................................................................. 97
Table 40 - 13 and 15 ton Unit Filters
............................................................................................ 98
Table 41 - 16-25 and 30 ton Unit Filters
....................................................................................... 98
Summary of Contents for RN Series
Page 2: ......
Page 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Gasket Locations...
Page 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Gasket Locations...
Page 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Gasket Locations...
Page 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Gasket Locations...
Page 42: ...42 Figure 19 Seismic Rigid Mount Curb...
Page 80: ...80 Gas Heater Instructions Figure 43 Gas Heater Instructions...
Page 113: ......
Page 114: ......
Page 115: ......