
31
Be careful to install the provided neoprene
gasket according to the following figure
prior to setting the unit on the curb.
Where the supply or warm air duct
passes through a combustible roof, a
clearance of 1 inch must be
maintained between the outside
edges of the duct and combustible
material in accordance with National
Fire Protection Association Standard
No. 90A. Provide flashings or
enclosure between structure and roof
and all joints must be sealed with
mastic roofing to ensure a watertight
seal.
CAUTION
All roofing work should be performed
by competent roofing contractors to
avoid any possible leakage.
CAUTION
Summary of Contents for RN Series
Page 2: ......
Page 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Gasket Locations...
Page 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Gasket Locations...
Page 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Gasket Locations...
Page 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Gasket Locations...
Page 42: ...42 Figure 19 Seismic Rigid Mount Curb...
Page 80: ...80 Gas Heater Instructions Figure 43 Gas Heater Instructions...
Page 113: ......
Page 114: ......
Page 115: ......