39
Duct Connection
Note:
If outside air will be in contact with
the air tunnel base of an A, B or C cabinet
unit (6-25 and 30 tons), the unit should
include the base insulation option or the
base must be field insulated. D and E
cabinet (26 and 31-140 tons) units include
base insulation standard.
Figure 14 - Duct Connection
Do not drill or punch holes in the
base of the unit, from inside the unit
or from below the unit to attach
ductwork. Leaking may occur if unit
base is punctured.
CAUTION
Summary of Contents for RN Series
Page 2: ......
Page 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Gasket Locations...
Page 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Gasket Locations...
Page 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Gasket Locations...
Page 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Gasket Locations...
Page 42: ...42 Figure 19 Seismic Rigid Mount Curb...
Page 80: ...80 Gas Heater Instructions Figure 43 Gas Heater Instructions...
Page 113: ......
Page 114: ......
Page 115: ......