13
IOM D-040L 2”
Second Stage Maintenance
Perform if the first stage doesn't solve the leak, if one of the seals or inner parts need replacement or for periodic
maintenance to thoroughly clean the valve.
5.3.1. Releasing Pressure
•
Shut the isolating valve located on the riser under the air valve
•
Carefully release the pressure by slowly unscrewing the valve until all pressure is released
•
Continue to unscrew the valve until all the liquid is drained from the air valve
•
Important: Discard liquid to comply with local regulations
5.3.2. Removal of the Air Valve Body
•
Slowly turn the Body (1) counterclockwise, and remove it [2]
•
Remove the Discharge Outlet Elbow (Snap-on or thread) [3], [4]
1
2
3