Iron Removal Setup…
Installation by a certified water treatment professional is highly recommended.
1.
Remove distributor tube and basket from empty tank and remove the wrapping from the basket.
2.
Attach tubing from the air release system (R00018) to the hose barb (R00019) in the in/out head
(R0005).
3.
Attach the distributor tube into the in/out head.
4.
Secure the air release valve to the distributor tube with a zip tie.
5.
Insert this assembly into the empty tank and screw tight onto the tank.
6.
Screw the filter valve onto the media tank.
7.
Set the filter valve to backwash (regenerate) every five days is typical. (refer to valve manual for
directions)
8.
Attach connection manifold assembly (R00020) to the in/out head tank. Grease O-rings on each spool to
prevent damage and leaks. Ensure the orientation of the manifold is in the proper position with the inlet
to the in/out head first and secure with provided clips. Attach connection manifold assembly to the
filter valve using provided clips.
9.
Tape and attach the air inlet elbow with check valve (R0008-10) and both sample taps onto the bottom
of the connection manifold.
* If sample taps are not desired, please install enclosed plugs.
10.
Attach plastic bypass to meter assembly/connection manifold with provided clips.
11.
Connect the length of ¼” tubing to the air pump and elbow with check valve located on the underside
of the connection manifold.
12.
Mount air pump bracket in a convenient location, ensuring the cord and tubing reach.
13.
Plug in F11 filter valve, air pump, and meter monitor to a 120VAC GFI outlet.
14.
Turn bypass valve on to allow water to flow into the system.
15.
Manually turn on air pump using the red switch on the back of the pump until air is escaping through
air release fitting on the top of the in/out head and then turn switch off. The air pump will automatically
pressurize the tank with future water use.