If this concentric termination, through the wall type of venting system is 

preferred, the concentric vent kit can be ordered from the Service Parts 

Department under kit #9002749. Installation instructions are provided 

with the kit.

ventInG throuGh a roof

Two 3” inlet and outlet PVC Schedule 40 - 45° vent caps are supplied. 
A 5’ (1.5 m) section of 3” CPVC Schedule 40 outlet vent pipe is 

supplied with 75 gallon models and a 5’ (1.5 m) section of 3” ABS 

Schedule 40 outlet vent pipe is supplied with 50 gallon 65,000 Btu/

Hr models. More may be required and must be purchased locally.
1.  The water heater requires its own (separate) venting system.

2.  Only  3" ABS  Schedule  40  piping  and  fittings  are  acceptable 

materials on the first five feet of the outlet vent system on the 

50 gallon 65,000 BTU/HR models and 3" CPVC Schedule 40 

piping and Schedule 80 fittings are acceptable materials on the 

first five feet of the outlet vent system on 75 gallon models.

3.  3”  PVC, ABS,  or  CPVC  Schedule  40  piping  and  fittings  are 

acceptable materials for the inlet vent system and for the outlet 

vent system after the first five feet (1.5 m).

4.  The unit cannot be connected to existing vent piping or chimney.

5.  Venting must terminate vertically to the outdoors.

6.  The  total  vertical  and  horizontal  vent  runs  cannot  exceed  the 

maximum  length  with  a  maximum  number  of  90°  elbows  as 

specified in the table below. If more elbows are required, the 

venting distance must be reduced 5 feet for every 90° elbow.

The number of 90° elbows shown in the table is for both the intake

air and vent pipes. IE: The vent pipe can contain three 90° elbows, 

the intake air pipe can also contain three 90° elbows.

3" dIa. vents MaX. 

lenGth (ft.)

nuMBer of 90° 

elBows*

45

1

40

2

35

3

*NOTE: Two 45° elbows are equivalent to one 90° elbow. One 90° 

elbow equals 5 feet (1.5 m) of equivalent vent length.

fIGure 30.

vent pIpe preparatIon

1. 

InItIal preparatIon

  A.   Make sure the solvent cement you are planning to use is 

designed for the specific application you are attempting.

  B.  Know  the  physical  and  chemical  characteristics  and 

limitations of the PVC, ABS and CPVC piping materials that 

you are about to use.

  C.  Know the reputation of your manufacturer and their products.

  D.  Know your own qualifications or those of your contractor. The 

solvent welding technique of joining PVC, ABS and CPVC pipe 

is a specialized skill just as any other pipe fitting technique.

  E.  Closely supervise the installation and inspect the finished  

job before start-up.

  F.  Contact the manufacturer, supplier, or competent consulting 

agency if you have any questions about the application or 

installation of PVC, ABS and CPVC pipe.

  G.  Take the time and effort to do a professional job.  Shortcuts 

will only cause you problems and delays in start-up.  By far, 

the majority of failures in PVC, ABS and CPVC systems are 

the result of shortcuts and/or improper joining techniques.

2. 

selectIon of MaterIals

•  Cutting Device - Saw or Pipe Cutter

•  Deburring Tool, Knife, File, or Beveling Machine (2” [5 cm] and above)

•  Brush - Pure Bristle

•  Rag - Cotton (Not Synthetic)

•  Primer and Cleaner

•  Solvent  Cement  -  PVC  for  PVC  Components  and  CPVC  for    

CPVC Components and ABS for ABS components.

•  Containers - Metal or Glass to hold Primer and Cement.  Select  

the type of PVC, ABS or CPVC materials to be used on the basis 

of their application with respect to chemical resistance, pressure 

rating, temperature characteristics, etc.

•    Insertion Tool  -  Helpful  for  larger  diameter  pipe  and  fittings  6 

inches (15.2 cm) and above.

Summary of Contents for Power Direct ventedGasModels

Page 1: ...ND WARRANTY QUESTIONS SHOULD BE DIRECTED TO THE LOCAL DEALER FROM WHOM THE WATER HEATER WAS PURCHASED IF YOU ARE UNSUCCESSFUL PLEASE WRITE TO THE COMPANY LISTED ON THE RATING PLATE ON THE WATER HEATER...

Page 2: ...t IMPORTANT DEFINITIONS Qualified Installer A qualified installer must have ability equivalent to a licensed tradesman in the fields of plumbing air supply venting and gas supply including a thorough...

Page 3: ...3 GENERAL SAFETY...

Page 4: ...es see Figures 1 and 2 Examine the location to ensure the water heater complies with the Locating the New Water Heater section in this manual 6 For California installation this water heater must be br...

Page 5: ...tally vented gas fueled heating appli ance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS INSPECTION The s...

Page 6: ...Pressure Relief Valve O Flue P Flue Baffle Assembly Q Insulation R Rating Plate S Gas Supply T Manual Gas Shut off Valve U Ground Joint Union V Drip Leg Sediment Trap W Drain Valve X Gas Control Valve...

Page 7: ...ly children the infirm or physically mentally disabled If anyone using hot water in your home fits into one of these groups or if there is a local code or state law requiring a certain temperature wat...

Page 8: ...ct to leakage in various ways Sensors mounted in the drain pan that trigger an alarm or turn off the incoming water to the water heater when leakage is detected Sensors mounted in the drain pan that t...

Page 9: ...you have any doubts or questions at all call your gas company Failure to provide ventilation air can result in a fire or explosion and can cause DEATH SERIOUS BODILY INJURY OR PROPERTY DAMAGE FIGURE 5...

Page 10: ...he vent exhaust outlet and air inlet terminals shall terminate at least 18 45 7 cm above the roof surface see Figure 9 FIGURE 9 AIR FOR VENTILATION FOR APPLIANCES LOCATED IN CONFINED SPACES Air for ve...

Page 11: ...interfere with safe operation of the water heater Do not cover the outer door thermostat temperature pressure relief valve or FV Sensor Do not let insulation around the gas water heater get within 8...

Page 12: ...ng cleaning and other sanitizing needs can scald and permanently injure you upon contact Some people are more likely to be permanently injured by hot water than others These include the elderly childr...

Page 13: ...on the valve downward and provide tubing so that any discharge will exit only within 6 inches 15 2 cm above an adequate drain or outside of the building or structure Be certain that no contact is made...

Page 14: ...ks before lighting the water heater Use a soapy water solution not a match or open flame Rinse off soapy solution and wipe dry When installed at elevations above 7 700 feet 2 347 meters input rating s...

Page 15: ...embly installed 2 After the unit is set in place make sure the blower assembly is still mounted securely and make sure there is no damage to the blower 3 Make sure there is no packing material in the...

Page 16: ...separately from all other appliances The fittings other than the supplied VentTermination should be equivalent to the following PVC Schedule 40 DWV ASTM D 2665 CPVC Schedule 40 DWV ASTM F 438 ABS Sch...

Page 17: ...er the first five feet 4 The unit cannot be connected to existing vent piping or chimney 5 When venting through an outside wall the vents must terminate horizontally to the outdoors B All 50 Gallon 65...

Page 18: ...own in the table is for both the intake air and vent pipes IE The vent pipe can contain three 90 elbows the intake air pipe can also contain three 90 elbows 3 DIA VENTS MAX LENGTH FT NUMBER OF 90 ELBO...

Page 19: ...wing use of pvc abs or cpvc pipe for inlet and outlet vent piping Inlet piping through any type wall FIGURE 26 connecting vent to blower 1 If making an immediate horizontal run of vent off the blower...

Page 20: ...o contain three 90 elbows 3 DIA VENTS MAX LENGTH FT NUMBER OF 90 ELBOWS 45 1 40 2 35 3 NOTE Two 45 elbows are equivalent to one 90 elbow One 90 elbow equals 5 feet 1 5 m of equivalent vent length FIGU...

Page 21: ...t be completely removed NOTE Power saws should be specifically designed to cut plastic pipe STEP A B Deburring Use a knife plastic pipe deburring tool or file to remove burrs from the end of small dia...

Page 22: ...fitting a 1 4 turn to evenly distribute the cement Do not continue to rotate the pipe after it has hit the bottom of the fitting socket A good joint will have sufficient cement to make a bead all the...

Page 23: ...23...

Page 24: ...ccess If a suitable area is not available a cover should be installed over the thermostat to prevent tampering The water temperature setting was factory set at the lowest temperature Pressing the COOL...

Page 25: ...w when it is heated As the volume of water grows there will be a corresponding increase in water pressure due to thermal expansion Thermal expansion can cause premature tank failure leakage This type...

Page 26: ...ntact a qualified installer or service agency to replace a flooded water heater Do not attempt to repair the unit It must be replaced At least once a year a visual inspection should be made of the mai...

Page 27: ...xible anode rods are available for replacement In replacing the anode 1 Turn off gas supply to the water heater 2 Shut off the water supply and open a nearby hot water faucet to depressurize the water...

Page 28: ...under Lighting Instructions to restart the water heater Drain Valve Washer Replacement See Figure 34 1 Turn OFF gas supply to water heater 2 Follow Draining instructions 3 Turning counterclockwise rem...

Page 29: ...e relief valve may be leaking at the tank fitting F Water from a drain valve may be due to the valve being slightly opened G The drain valve may be leaking at the tank fitting H Combustion products co...

Page 30: ...s Control Valve 28 Pressure Switch Air 29 Flue Baffle Assembly 30 Baffle Adaptor Collar Assembly 31 Optional Deluxe Horizontal Vent Kit 32 Optional 3 PVC Horizontal Vent Kit 75 Gallon Only Now that yo...

Page 31: ...s used per the installation instructions in the manual that came with the water heater 3 Ensure maximum number of elbows or maximum equivalent feet of vent or intake air pipe has not been exceeded per...

Page 32: ...rted 1 Turn the power off for 10 20 seconds then on again to clear these error codes 2 Replace the gas control valve if the error code persists 14 The gas control valve has detected the FV flammable v...

Page 33: ...gas clean burner head Combustion air path restricted Check intake venting arrangement for obstructions Not enough dilution air for proper combustion Check intake venting arrangement for obstructions...

Page 34: ...not conform with specifications of the heating component manufacturer This warranty gives you specific legal rights and you may have other rights which vary under the laws of each province If any prov...

Page 35: ...ilar water heater or parts thereof which are manufactured or distributed by the warrantor Dealer replacements are made subject to in warranty validation by warrantor PROOF OF PURCHASE AND PROOF OF INS...

Page 36: ......

Reviews: