ITS 300
29
3
4
9
17
11
14
14
14
12
A
E
4
18
19
H
A
3
4
1
5
15
16
A
11
14
14
14
12
9
2 Installation
2.1 Installation diagram
This figure shows the installation diagram. This diagram is referred to in the sections
describing the actual connection procedure.
VENTED
UNVENTED
Legend
1. pressure relief valve
(mandatory if mains water
pressure is too high)
3. T&P-valve (mandatory)
4. stop valve (recommended)
5. non-return valve (mandatory)
6. circulation pump (optional)
9. drain valve
11. service stop valve
12. temperature gauge (optional)
14. draw-off points
15. expansion valve (mandatory)
16. expansion vessel (mandatory)
17. 3-way aeration valve (recommended)
18. cold water head tank
19. float switch
A. cold water supply
B. hot water supply
C. circulation pipe
E. overflow pipe
F. inlet heat exchanger
G. outlet heat exchanger
H. overflow protection
Summary of Contents for ITS - 300
Page 2: ......
Page 4: ...ITS 300 4...
Page 6: ...ITS 300 6...
Page 8: ...ITS 300 8...
Page 11: ...ITS 300 11 5 U T K N A S P D V O 9 M G R H J 8A 1 3 7 4 8C 10 8B 6 2...
Page 12: ...ITS 300 12...
Page 19: ...ITS 300 19...
Page 20: ...ITS 300 20...
Page 22: ...ITS 300 22...
Page 24: ...ITS 300 24...
Page 27: ...ITS 300 27 5 U T K N A S P D V O 9 M G R H J 8A 1 3 7 4 8C 10 8B 6 2...
Page 28: ...ITS 300 28...
Page 32: ...ITS 300 32...
Page 37: ...ITS 300 37...
Page 38: ...ITS 300 38...
Page 40: ...ITS 300 40...
Page 42: ...ITS 300 42...
Page 45: ...ITS 300 45 5 U T K N A S P D V O 9 M G R H J 8A 1 3 7 4 8C 10 8B 6 2...
Page 46: ...ITS 300 46...
Page 53: ...ITS 300 53...