4. Tighten the base
Tighten the locking bolts at the base
with an M7 allen key (provided).
Allen key
5. Install the faucet
Cut two flexible pipes
of the right length and
insert them through a
holder at the faucet’s
main body. Insertion
points should
correspond with the
specially designed
connection holes of
the mounting base.
Body
Tip
: Before insertion, draw a line 16mm away from the end of the water pipe. After the water pipe is inserted,
the marking line should not be visible.
Align the
faucet with the
mounting base
and use a
wrench to fix
the nut firmly
on to the
mounting base.
6. Tighten the nut
Nut
Wrench
7. Complete installation
Place base cap
above the nut to
complete the
installation.
Base cap
Note
: When cleaning the surface of the faucet, use a soft sponge. Avoid metal sponges to prevent scratches
and damage. A faucet damaged in this manner will not be covered under the warranty.
2. Install base reinforcement
3. Insert the base
Insert the
mounting base
into the hole
from above.
Tear off the double-sided tape on the base
of the base reinforcement and paste it at
the inline at the base of the hole.
Mounting
base
Lock bolt, base