Appendices
92
Instruction Manual BFC
A
is
A.2
Electrical diagram
BFC
TERMINAL STRIP CONNECTIONS:
A
Earth
N
Neutral
L
1
Phase input of controller
L
2
Phase input of isolating transformer (primary side)
L
3
Phase output of isolating transformer (secondary side)
L
4
Phase input of program-controlled pump
L
5
Phase input of continuous pump
COMPONENTS:
A
Controller
B
Ionisation rod
C
Glow igniter
D
Gas control
E
Burner earth connection
F
Extra ON mode switch
G
Continuous pump
H
Program-controlled pump
J
Extra error signal
K
Isolating transformer
L
Double-pole mains switch
M
ON/OFF switch control
N
Display/Flat cable
O
Fan
P
Temperature sensor (T2 - bottom of tank)
Q
Dummy
R
Temperature sensor (T1 - top of tank)
S
Selection resistor
T
Pressure switch
CONTROLLER CONNECTIONS:
J1
Connector for display to controller
J2
Connector for power supply to controller
J19 Connector for extra error signal
J20 Connector for gas control
J21 Connector for program-controlled pump
J24 Connector for fan
JP2 Connector for ionisation rod and glow igniter
JP3 Connector for temperature sensor T2
JP4 Connector for dummy
JP5 Connector for temperature sensor T1
JP6 Connector for selection resistor and pressure switch
JP8 Connector for extra ON mode switch
F1
Fuse
F2
Fuse
Figure A.1
Electrical diagram BFC
#
$
%
&
'
(
= white (flat ca-
= grey/beige
= brown
= blue
= yellow/green
= black
%
= brown
Summary of Contents for 28 30 50 60
Page 2: ...your installer www aosmithinternational com...
Page 4: ...4 Instruction Manual BFC...
Page 12: ...Introduction 12 Instruction Manual BFC 1 gis...
Page 38: ...Installation 38 Instruction Manual BFC 3 is...
Page 42: ...Filling and draining 42 Instruction Manual BFC 4 gis...
Page 48: ...Status of the appliance 48 Instruction Manual BFC 6 gis...
Page 64: ...Main menu 64 Instruction Manual BFC 8 gis...
Page 68: ...Service program 68 Instruction Manual BFC 9 is...
Page 84: ...Maintenance frequency 84 Instruction Manual BFC 11 gs...
Page 94: ...Release R 1 3 UK 94...