BTR TANK TYPE HEATERS
SERVICE HANDBOOK
A.O. Smith Water Products
Service Handbook
Irving, Texas ©2000
Training Department
39
STEP 17
IID MODULE TEST
Pilot is lit - Sparking has stopped.
STEP 17. IID MODULE TEST (Power to the Main Valve).
Using a multimeter, test for
24 VAC between terminal MV on the IID and 24V (GND).
IF
THEN
24 VAC is not present:
•
Replace the IID module. Conduct Step
18 before applying power to
replacement module.
24 VAC is present:
•
Go to step 18.
Summary of Contents for 120 trough 500
Page 1: ......