Furnace Installation and Owners Manual
7
LDJ620_E01_R03_2006.03
Models LDJ620-9 and LDJ620-10
Standard 211 and all applicable building codes.
Consult a qualified furnace installer and/or local
building inspector to make sure the chimney and
connections comply.
For more information on venting with listed
chimneys, refer to “Venting Information” on
page 34.
Barometric Draft Controls
IMPORTANT: In order for the furnace to operate
correctly, 0.04" to 0.06" water column of draft
during low-fire operation must be established
and maintained. Low-fire operation is when the
thermostat is satisfied and no fuel is being
augered into the burner. If the chimney draft is
too high, the fire will go out. If the draft is too low,
smoke may back up into the furnace and
storage bin, creating a possible hazard.
The procedure for establishing the proper
chimney draft will be discussed in the
“Installation” section starting on page 7.
For more information on the barometric draft
regulator, refer to “Barometric Draft Control
Information” on page 36.
I
N S T A L L A T I O N
Required Tools
•
Flat bit screwdrivers
•
Phillips screwdriver
•
5/16" hex driver
•
3/8" hex driver
•
7/16" wrench
•
7/16" socket
•
Drill and 1/4" bit
Unpacking and Setup - Furnace
IMPORTANT: Before unpacking and assembling
the A-MAIZE-ING HEAT
®
furnace, review the
“Installation and Location Considerations”
section starting on page 5 for the proper
placement of the furnace and storage bin.
Step 1: Remove all shipping materials.
Step 2: Remove three screws holding furnace to
pallet and remove furnace from pallet.
• Access one screw by removing filter door.
• Remove the other two screws from beneath
the pallet.
Step 3: Remove auger motor assembly and
hardware package from ash pan drawer.
Step 4: Insert burner auger assembly (1) into
burner auger tube (2).
1
2