Furnace Installation and Owners Manual
9
LDJ620_E01_R03_2006.03
Models LDJ620-9 and LDJ620-10
Step 4: Slide auger boot (6) with clamp (7) over
bin outlet. Tighten clamp securely.
Step 5: Install two sheet metals screws through
clamp, auger boot, and into the bin outlet for a
permanent connection.
Step 6: Install coupler (8) between bin auger
tube and furnace fuel inlet. Secure with two
hose clamps (9).
Step 7: Attach flexible conduit (10) from bin
auger to furnace auger motor housing (11)
with a conduit locknut.
Step 8: Connect one black bin auger motor wire
to the two orange wires in the auger motor
housing with a wire nut connector.
Step 9: Connect the other black bin auger motor
wire to the two white wires in the auger motor
housing with a wire nut connector.
Step 10: Install cover on auger motor housing.
Ducting
IMPORTANT: The hot and cold air furnace
connections to the A-MAIZE-ING HEAT
®
furnace must not be less than 196 square
inches. Any reduction in size of the connections
will restrict air movement through the heat
exchanger, resulting in overheating and
operational problems with the furnace.
NOTE: For more information on ducting
guidelines and installation, refer to “Ducting
Information” on page 38.
6
7
8
9
9
10
11