A.B.S. Flexilo SPRING Assembly-, Operating-, And Filling Instructions Download Page 16

Operating and Assembly Instructions – A.B.S. Flexilo for wood pellets 
 
Assembly 
 

Subject to technical change 

Issue 09/2016 

Page 16 of 30 

©A.B.S. Silo- und Förderanlagen GmbH 

 

5  Assembly 

5.1  Pre-Assembly of the drawing irons 

The drawing irons, flat material 25x5 mm, are divided in the galvanized plug-in system 
version and must be fastened with screws M12 x 30 prior to assembly .

 

 
Please note that for rectangular silos, NOT for square silos, the scope of delivery contains 8 
shorter and 8 longer drawing irons. These are assembled to 4 drawing irons for the long and 
4 drawing irons for the shorter silo side.

 

 

Screwed connection of the divided drawing irons 

CAUTION: Take care to bolt the drawing irons together in such a way that the bolts point 
outwards to avoid them rubbing against the fabric. 
 

5.2  Assembling the frame and struts 

 

 

 

 

Do not start assembling the silo until you have become familiar with the situation at 
the installation site and the room layout discussed in Section 3.   

 

CAUTION! RISK OF INJURY! 
 
Wear safety gloves during assembly of the steel frame as protection 
against sharp edged metal components. 

 

 

 

Pay attention to the room layout with regard to entry door and filling set.

 

Check the room height.

 

 
If filling is executed inside the room, please note that the minimum distance from 
the wall to the frame has to be 80 - 100 cm, on the side where the silo will be filled. 
 
Plug the plug-in elements into the frame stands and then connect the drawing irons 
to the outer side. To connect the drawing irons with the stands and the plug-in 
elements use screws M12x30.

 

 
With rectangular silos the drawing irons have a different length. The longer parts 
must both be assembled on the two longer silo sides.  
 
Protect yourself from frame feet which can tumble down and protect them while 
assembling. 
 

Summary of Contents for Flexilo SPRING

Page 1: ...tended for skilled mechanics which have based on expert training the respective knowledge and experience As we are interested in continuously improving our technical documentation we would be pleased...

Page 2: ...1 Distance from walls 9 3 1 2 Distance from ceiling 9 3 2 Condition of the room 10 3 3 Room fixtures 10 3 4 Room deaeration 11 3 5 Size Storage Volume 11 4 Scope of delivery 12 4 1 Scope of delivery...

Page 3: ...Wood pellets for non industrial use ENplus Handbook for the certification of wood pellets for heating use version 2 0 Sample fire ordinance 2005 VDI guideline 3464 green print 2012 storage of wood pe...

Page 4: ...n impair operation of your heating system and have an adverse effect on the storage and conveying equipment Only high grade pellets can assure reliable and problem free operation of the pellet fired b...

Page 5: ...of not yet released additive pellets PowerPlus pelprotec etc Please contact us for information on the current supply level In case of white rust White rust can occur during transport for example Prot...

Page 6: ...t possible sources of danger to the customer The currently valid fire protection and VDI guidelines must be satisfied prior to start up In order to avoid hazards associated with improper handling of t...

Page 7: ...lo for wood pellets when it is delivered Nameplate with calculated storage capacity 2 5 Maintenance Regular cleaning of the bearing is required to ensure continuous trouble free and safe heating opera...

Page 8: ...process The result is that the release of the volatile components is faster especially in fresh pellets and at high ambient temperatures Emissions usually decrease after a few weeks and the odour asso...

Page 9: ...r to installation The dimensions of the silo frame are stated on the delivery documents The dimensions of the silo frame can be determined by measuring the steel parts Length of the frame Length of th...

Page 10: ...ondensation must not occur In case of humidity the room must be ventilated properly The silo fabric is air permeable and may cause the wood pellets to absorb humidity at the silo walls Make also sure...

Page 11: ...en aerating the Flexilo Only on customer request the Flexilo for wood pellets can be supplied with a filling line and an exhaust air line in case of rooms without exhaust air or in specific cases But...

Page 12: ...pped bundled on a pallet and a silo bag which is packed in a carton together with accessories and hardware required for assembly Delivery of the components 4 1 Scope of delivery standard Pos Illustrat...

Page 13: ...and strap according to silo 4 6 8 and 2x spring pipe connection screw 8 included 32x 16x 48x Screw sack with connecting material for drawing irons 32 hexagon screws M12 x 30 16 hexagon nuts M12 48 wa...

Page 14: ...er filling pipe 1 fastener 36 36 2 pipe clamps M10 M12 pre assembled on the fastener 12 2x 2x 4x Screw set for filling set pre assembled on the fastener 2 hex screws M12 x 25 2 spring washers 12 2 4 w...

Page 15: ...change Issue 09 2016 Page 15 of 30 A B S Silo und F rderanlagen GmbH 18 OPTIONAL Support Structure for fixing the silo lid pipe must be provided by the customer 19 1 x Assembly Instructions 1 x Filli...

Page 16: ...ssembling the frame and struts Do not start assembling the silo until you have become familiar with the situation at the installation site and the room layout discussed in Section 3 CAUTION RISK OF IN...

Page 17: ...09 2016 Page 17 of 30 A B S Silo und F rderanlagen GmbH Connecting the frame feet to the plug in elements of the top and base connectors Assembly of the plug in elements Assemble the steel frame until...

Page 18: ...silo bag the lifting bar must have boreholes for the filling set 3 Align the silo bag 4 Make the necessary arrangements regarding the fastening of the silo lid according to point 5 4 5 Loop the liftin...

Page 19: ...ts Assembly Subject to technical change Issue 09 2016 Page 19 of 30 A B S Silo und F rderanlagen GmbH Details of the corner bolting Pay attention to the alignment of the silo when connecting the angle...

Page 20: ...r the baffle that is sewn into the cover fabric opposite the filler neck Take care of the position of the supporting loops prior to attach the ceiling holders to the spread silo The loops must be atta...

Page 21: ...the filling set as described in chapter Earthing I II III 2 Use the bolts provided to attach the filling line to the top bar 3 Slide the filler neck over the filling line and beaded edge of the filli...

Page 22: ...silo size because during the filling the sides of the silo bag will be pressed outwards Generally should the discharge units NOT fixed on the ground so that the silo has the possibility to lift up and...

Page 23: ...that the bores in the spring pipes will be placed in the out cuts of the loops The eye screws which are included in the scope of delivery will be fixed in the bores with the washers and nuts Put the...

Page 24: ...attached in a clearly visible location on a frame leg or the filling line Check the room layout wall and ceiling clearance condition of the room fixtures in the room room ventilation Have the frame ea...

Page 25: ...tures and swivelling jib 3 Climbing equipment The contractor must ensure that 1 Storage facilities whose upper edges are more than 1 m above the floor and must be mounted for regular operational work...

Page 26: ...the filling couplings 8 1 General instructions Look after the accessibility of the filling nozzle s Make sure that that you have an adequate access road to your storage system 3 m width and 4 m headro...

Page 27: ...centered on the narrow side of the silo 8 3 Filling with two filling nozzles From a frame width of 2 5 m silos are equipped with a second filling nozzle In this case a better filling level will be rea...

Page 28: ...th 230V and 16A protection must be accessible outside the storage room This power connection can be used for a possible suction blower Note before filling Switch off the heating system prior to starti...

Page 29: ...and the hose length The filling pressure should be between 0 3 bars for a hose length of about 10 m and 0 6 bars for a hose length of about 30 m The required filling pressure and air flow rate can var...

Page 30: ...be bolt together with the lifting bar o The filling pipes must be bolt together among each other by clamping rings so that no rotation occurs o The filling coupling must be easily accessible without...

Reviews: