![3M DBI SALA 2104700 User Instruction Manual Download Page 11](http://html.mh-extra.com/html/3m/dbi-sala-2104700/dbi-sala-2104700_user-instruction-manual_3044650011.webp)
Table 2 – Inspection and Maintenance Log
Inspection Date:
Inspected By:
Components:
Inspection:
(See Section 5 for
Inspection Frequency
)
User
Competent
Person
Sliding Beam
Anchor
(Figure 2)
Inspect the Sliding Beam Anchor damage: Look for cracks, dents, or deformities.
Inspect for bending or wear on the Support Tube (A), Connector Ring (B),
Connector Ring Bracket (C), Adjustable Hook Ends (D), and Tab Locks (E).
Inspect for any missing parts (End Rivets, Center Screw, etc.).
Inspect the entire unit for corrosion.
Inspect the wear pads to ensure they have not worn to a point where the hook
ends will be in direct contact with the beam flange. Replace worn or cracked wear
pads. (see Wear Pad Removal and Installation)
Inspect the Support Bar (A) Teeth for wear or damage. Ensure that the locking
pawl will fully engage each tooth automatically upon release of the Tab Locks (D).
Ensure the Tab Locks (D) operate freely, spring back fully, and automatically
engage with the Support Bar (A) Teeth.
Labels (Figure 11) Verify that all labels are present and fully legible.
Fall Protection
Equipment
Additional Fall Protection equipment that is used with the product should be
installed and inspected per the manufacturer instructions.
Serial Number(s):
Date Purchased:
Model Number:
Date of First Use:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date:
Corrective Action/Maintenance:
Approved By:
Next inspection due:
Date: