NA - ENG
April 2017
3M-Matic
™
Accuglide 2+ - 3 Inch Taping Head
Page 11
Figure 3-4 Tape Loading/Threading
Figure 3-5 Tape Loading/Threading
Operation
(continued)
Figure 3-4
Place tape roll on tape drum to
dispense tape with adhesive side
forward. Seat tape roll fully against
back
fl
ange of drum. Adhere tape
lead end to threading needle as
shown.
Manually turn tape roll to create
slack tape while pulling threading
needle through tape applying
mechanism until needle is through
and tape is in alignment with
applying
roller.
Excess tape can be cut with a
scissors at applying roller.
• To reduce the risk associated with
sharp blade hazards:
- Keep hands and
fi
ngers away from
tape cuto
ff
blades under orange blade
guards. The blades are extremely sharp.
WARNING
Summary of Contents for 10500
Page 2: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page ii ...
Page 4: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page iv ...
Page 6: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page vi ...
Page 10: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page 2 ...
Page 28: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page 20 ...
Page 30: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page 22 ...
Page 48: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page 40 ...
Page 49: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page 41 ...
Page 50: ...NA ENG April 2017 3M Matic Accuglide 2 3 Inch Taping Head Page 42 ...