![3DHISTECH P1000 Service Manual Download Page 60](http://html1.mh-extra.com/html/3dhistech/p1000/p1000_service-manual_442157060.webp)
P1000 SERVICE SOFTWARE MANUAL
14. SLIDE LOADING UNITS
SERVICE GUIDE
59
Open the Gripper on the Slide loader 3D panel (scroll bar) for a double wide slide (
User Interfaces and Functionalities of Motor/Component
). This is the widest possible state of the unit. Using the keyboard, adjust the distance by moving the Arm to the pre-recording
unit until it reaches the Brightfield illumination unit. Set the Gripper 1mm far from the unit frame.
1 mm