
3Com VCX V7111 Fast Track Installation Guide
13
C
HAPTER
2:
I
NSTALLING THE
VCX
V7111
To install the VCX V7111, follow these steps:
1
Unpack the VCX V7111(see Unpacking).
2
Check the package contents (see Package Contents)
3
Mount the VCX V7111 (see “Mounting the VCX V7111” on page 14).
4
Cable the VCC V7111(see “Cabling the VCX V7111” on page 18).
After connecting the VCX V7111
to the power source, the Ready and LAN LEDs on the front
panel turn to green (after a self-testing period of about 1 minute). Any malfunction changes
the Ready LED to red (see Monitoring the VCX V7111 Front Panel LEDs on page 45 for
details on the VCX V7111
LEDs).
You’re now ready to start configuring the gateway (see
Chapter 3: Configuring the VCX
V7111 on page
27).
Unpacking
To unpack the VCX V7111, follow these steps:
1
Open the carton and remove the packing materials.
2
Remove the VCX V7111
gateway from the carton.
3
Check that there is no equipment damage.
4
Check, retain and process any documents.
5
Notify 3Com or your local supplier of any damage or discrepancies.
6
Retain any diskettes or CDs.
Package Contents
Ensure that the VCX V7111
package contains (in addition to the device):
AC power cable for the AC power supply option.
DC terminal block (VCX V7111 24FXS
only, for the DC power supply option).
CD (software and documentation).
Summary of Contents for VCX V7111
Page 10: ...3Com VCX V7111 Fast Track Installation Guide 10 Reader s Notes ...
Page 12: ...3Com VCX V7111 Fast Track Installation Guide 12 ...
Page 26: ...3Com VCX V7111 Fast Track Installation Guide 26 ...
Page 42: ...3Com VCX V7111 Fast Track Installation Guide 42 ...
Page 48: ...3Com VCX V7111 Fast Track Installation Guide 48 ...
Page 58: ...3Com VCX V7111 Fast Track Installation Guide 58 Figure 32 VCX V7111 4FXS IP PBX Test Example ...