
84
C
HAPTER
6: C
ONFIGURING
THE
C
ORE
B
UILDER
7000 F
AMILY
ATM S
WITCH
Migrating from E-IISP to PNNI
In order to migrate successfully to PNNI, the network manager must
review the network address scheme that will be used. There are two
possible approaches to implementing address change:
■
Deriving a PNNI peer group ID and peer group level based on the E-IISP
addressing scheme. See Chapter 3 in the Operations Guide for
information on E-IISP addressing.
■
Changing the E-IISP network prefixes to match the PNNI addressing
scheme.
The gateway between E-IISP and PNNI must be between the E-IISP
highest level and the PNNI gateway node.
Summary of Contents for CoreBuilder 7000
Page 8: ......
Page 20: ...20 CHAPTER 1 OVERVIEW...
Page 54: ...54 CHAPTER 5 POWER ON...
Page 96: ...96 CHAPTER 8 TROUBLESHOOTING...
Page 100: ...100 APPENDIX A ATM SWITCH FA 24 CELL SWITCHING MODULE SPECIFICATIONS...
Page 104: ...104 APPENDIX B SAFETY INFORMATION...
Page 122: ...122 APPENDIX D CABLING REQUIREMENTS...
Page 128: ...128 APPENDIX E TECHNICAL SUPPORT...
Page 148: ...148 INDEX...