
40
C
HAPTER
4: I
NSTALLING
AND
C
ONNECTING
C
ORE
B
UILDER
M
ODULES
This item could be done through the LMA but it is preferred to do so
through the NMS since the LMA will not show any redundant LES that
exists.
22
Reboot the switch using the LMA menu sequence: (1) SYS / (7) RBO. The
purpose of this step is to make the second card active in order to check
the LANE services there.
23
After the second switch module boots, verify connectivity with the NMS
station as in step 8).
24
Perform step 19) and 20) to verify LECS order.
25
Open the Backbone and Services Select window again and use it to check
the LECS database is correct.
The hardware and LANE redundancy procedure is finished.
Summary of Contents for CoreBuilder 7000
Page 8: ......
Page 20: ...20 CHAPTER 1 OVERVIEW...
Page 54: ...54 CHAPTER 5 POWER ON...
Page 96: ...96 CHAPTER 8 TROUBLESHOOTING...
Page 100: ...100 APPENDIX A ATM SWITCH FA 24 CELL SWITCHING MODULE SPECIFICATIONS...
Page 104: ...104 APPENDIX B SAFETY INFORMATION...
Page 122: ...122 APPENDIX D CABLING REQUIREMENTS...
Page 128: ...128 APPENDIX E TECHNICAL SUPPORT...
Page 148: ...148 INDEX...