72
C
HAPTER
4: C
REATING
AN
XRN S
TACKING
F
ABRIC
Table 19
SuperStack 4 Switch 5500 Support for XRN Distributed Fabric
Stacking Switch 5500 Units
1
Ensure that the Switch units that you wish to interconnect have the latest
software agent installed. You can use the
display version
command to check this.
2
Enable the ‘up port’ and the ‘down port’ on each Switch (see
Table 19
) to
operate in Fabric mode using the following
CLI command. From the
System View enter
fabric-port gigabitethernet 1/0/51
enable
,
for example.
Switch
Port used
XRN support
Switch 5500-SI 28-Port
(3CR17151-91)
Ports 27 (up port) and 28 (down
port) using a 1000 Mbps SFP
transceiver
Only supports DDM
*
* Distributed Device Management
Switch 5500-SI 52-Port
(3CR17152-91)
Ports 51 (up port) and 52 (down
port) using a 1000 Mbps SFP
transceiver
Only supports DDM*
Switch 5500-EI 28-Port
(3CR17161-91)
Ports 27 (up port) and 28 (down
port) using a 1000 Mbps SFP
transceiver
Full XRN functionality
Switch 5500-EI 52-Port
(3CR17162-91)
Ports 51 (up port) and 52 (down
port) using a 1000 Mbps SFP
transceiver
Full XRN functionality
Switch 5500-EI PWR
28-Port (3CR17171-91)
Ports 27 (up port) and 28 (down
port) using a 1000 Mbps SFP
transceiver
Full XRN functionality
Switch 5500-EI PWR
52-Port (3CR17172-91)
Ports 51 (up port) and 52 (down
port) using a 1000 Mbps SFP
transceiver
Full XRN functionality
Switch 5500-EI FX 28-Port
(3CR17181-91)
Ports 27 (up port) and 28 (down
port) via 10/100/1000BASE-T
ports
Full XRN functionality
Switch 5500G-EI 24-Port
(3CR17254-91)
Two dedicated stacking cable
ports (one ‘up’ and one ‘down’)
on the rear of the unit.
Full XRN functionality
Switch 5500G-EI 48-Port
(3CR17255-91)
Two dedicated stacking cable
ports (one ‘up’ and one ‘down’)
on the rear of the unit.
Full XRN functionality
Switch 5500G-EI SFP
24-Port (3CR17259-91)
Two dedicated stacking cable
ports (one ‘up’ and one ‘down’)
on the rear of the unit.
Full XRN functionality
Summary of Contents for 3CR17251-91 - Switch 5500G-EI Stackable Gigabit...
Page 8: ......
Page 48: ...48 CHAPTER 2 INSTALLING THE SWITCH...
Page 70: ...70 CHAPTER 3 SETTING UP FOR MANAGEMENT...
Page 76: ...76 CHAPTER 4 CREATING AN XRN STACKING FABRIC...
Page 84: ...84 CHAPTER 5 PROBLEM SOLVING...
Page 122: ...122 APPENDIX A SAFETY INFORMATION...
Page 126: ...126 APPENDIX B PIN OUTS...
Page 140: ...140 APPENDIX C TECHNICAL SPECIFICATIONS...
Page 148: ......