6. INSTALLATION
The recommended values for lead-in cables and circuit breakers
Units with integrated preheating
Type
Number
of phases
Voltage
(V)
Power
(W)
Current
(A)
Type
of cable*
Type of circuit
breaker
(A)*
HR95-080..-..-..E.
1
230
2700
14,4
3Cx1,5
16
HR95-150..-..-..E.
3
400
5300
13,3
5Cx1,5
16
HR95-250..-..-..E.
3
400
8300
18,2
5Cx2,5
20
HR95-350..-..-..E.
3
400
11700
20,4
5Cx2,5
25
HR95-450..-..-..E.
3
400
15000
25,2
5Cx4
32
HR95-550..-..-..E.
3
400
18300
32
5Cx6
40
* - Recommended values. values must be specified by the person responsible for the wiring in the building
(e.g. designer) with regard to parameters of the power line wiring and other parameters of the building
Units with integrated electric postheater
Type
Number
of phases
Voltage
(V)
Power
(W)
Current
(A)
Type
of cable*
Type of circuit
breaker
(A)*
HR95-080..-..-...E
1
230
1400
8,7
3Cx1,5
16
HR95-150..-..-...E
1
230
2700
18
3Cx2,5
20
HR95-250..-..-...E
3
400
4800
13,1
5Cx1,5
16
HR95-350..-..-...E
3
400
6500
12,9
5Cx1,5
16
HR95-450..-..-...E
3
400
7700
14,6
5Cx1,5
16
HR95-550..-..-...E
3
400
10700
21
5Cx2,5
25
* - Recommended values. values must be specified by the person responsible for the wiring in the building
(e.g. designer) with regard to parameters of the power line wiring and other parameters of the building
Units with integrated electric preheater and postheater
Type
Number
of phases
Voltage
(V)
Power
(W)
Current
(A)
Type
of cable*
Type of circuit
breaker
(A)*
HR95-080..-..-..EE
3
400
4100
11,8
5Cx1,5
16
HR95-150..-..-..EE
3
400
8000
18
5Cx2,5
20
HR95-250..-..-..EE
3
400
13100
25
5Cx4
32
HR95-350..-..-..EE
3
400
18200
29,8
5Cx4
32
HR95-450..-..-..EE
3
400
22700
36,3
5Cx6
40
HR95-550..-..-..EE
3
400
29000
47,5
5Cx10
50
* - Recommended values. Values must be specified by the person responsible for the wiring in the building
(e.g. designer) with regard to parameters of the power line wiring and other parameters of the building