![background image](http://html.mh-extra.com/html/2gig-technologies/go-control/go-control_install-manual_439580015.webp)
14
©2013 2GIG Technologies Inc. All Rights Reserved.
Go!Control Wireless Security System | Install Guide
BACKUP BATTERY
CONNECTION AND POWER
SUPPLY WIRING
The
backup
battery
connects
to
the
Control
Panel’s
circuit
board
with
a
2
‐
pin
header
assembly.
The
power
supply
features
a
2
‐
position
terminal
block
for
connecting
the
power
supply
to
the
Control
Panel
power
terminals
(connection
wire
not
included).
1
Determine
a
good
location
where
there’s
a
wall
outlet
for
the
plug
‐
in
power
supply.
The
wall
outlet
must
be
un
‐
switched.
NOTE:
Do
not
connect
the
power
supply
to
a
receptacle
controlled
by
a
switch.
2
Route
2
‐
conductor
wire
from
the
power
supply
location
to
the
Control
Panel
mounting
plate.
For
wire
size
and
maximum
length,
see
Wire
Size
and
Length
below
.
3
Being
careful
to
observe
polarity,
connect
the
wire
to
the
power
supply’s
DC
+
and
DC
‐
terminals.
Do
not
plug
in
power
supply
yet.
4
Being
careful
to
observe
polarity,
connect
the
wire
to
the
Control
Panel
input
terminals
14VDC(+)
Terminal
#1
and
14VDC(
‐
)
Terminal
#2.
NOTE:
Grounding
of
the
Control
Panel
is
NOT
required
for
proper
operation.
5
Plug
the
backup
battery
pack’s
connector
into
the
connector
on
the
Control
Panel’s
circuit
board.
(The
Control
Panel
does
not
recognize
that
the
battery
is
connected
until
AC
power
is
connected
to
the
power
supply).
NOTE:
Applicable
regulatory
agencies
require
installation
of
the
extended
life
backup
battery
inside
the
Control
Panel
for
24
‐
hour
battery
backup
applications.
Wire Size and Length
To
ensure
proper
operation,
Do
Not
exceed
the
following
maximum
length
for
the
wire
size
installed:
To
ensure
that
the
appropriate
wire
size
and
length
are
installed,
measure
the
voltage
between
the
power
connection
terminals
at
the
back
of
the
control
panel.
The
voltage
measured
must
not
fall
below
11
volts
DC
or
nuisance
“AC
Power
Loss”
messages
may
be
displayed
and
reported.
NOTE:
In
the
United
States,
wiring
routed
inside
walls,
ceilings,
and
floors
must
comply
with
requirements
of
the
National
Electrical
Code,
ANSI/NFPA
70
and
local
building
codes.
For
wiring
from
the
output
of
the
2GIG
class
II
power
supply,
wiring
rated
CL2,
CL2X,
CL2R,
or
PLTC
is
recommended
to
satisfy
these
requirements.
If
this
wiring
is
installed
in
an
air
plenum
(space
used
for
environmental
air
exchange)
it
must
be
rated
CL2P
(plenum
rated).
A
Left
Terminal
14
VDC(+)
C
14
VDC(+)
Terminal
#1
B
Right
Terminal
14
VDC(
‐
)
D
14
VDC(
‐
)
Terminal
#2
Control Panel and Power Supply
Wiring
With
all
the
wiring
complete,
the
Control
Panel
is
ready
to
power
up.
1
Swing
the
Control
Panel
up,
placing
the
bottom
over
the
lip
of
the
mounting
bracket.
Push
the
top
of
the
Control
Panel
into
the
mounting
bracket
until
it
snaps
into
place,
then
secure
it
with
the
retaining
screw.
Wire Size
Maximum Length
22
AWG
55
feet
(16.8
meters)
20
AWG
85
feet
(25.9
meters
22
AWG
2
‐
pairs
(19
AWG
equivalent)
110
feet
(33.5
meters)
18
AWG
135
feet
(41.1
meters)