ZyXEL Communications IES-2500 Скачать руководство пользователя страница 64

IES-2500 User’s Guide 

Index 

Lightning .................................................................. A 

Limited Warranty ..................................................... iv 

Line Card Removal ................................................3-2 

List of Figures .......................................................... ix 

List of Tables............................................................. x 

Main Chassis ..................................................... C, 1-2 

Main Chassis Card Installation...............................3-1 

Main Chassis Card Removal ..................................3-2 

Main Chassis Slots ................................................... C 

Main Distribution Frame ........................................5-1 

Management Switch Card .................................xi, 1-2 

MDF .......................................................................5-1 

MDF Connections ..................................................5-1 

MDF Scenarios.......................................................5-2 

MSC ALM LED............................................. 9-1, 9-3 

MSC1000 ................................................................. xi 

MTU Application ...................................................1-4 

Online Registration................................................... xi 

Operating Environment 

IES.........................................................................E 

Patch Panel .............................................................5-3 

Philips Screwdriver, #2 ..........................................2-1 

Physical Specifications............................................. C 

Power......................................................................6-1 

Power Connections.................................................6-1 

Power Connections.................................................6-1 

Power Consumption 

IES........................................................................ D 

Power Maintenance ................................................8-1 

Power Module ........................................................1-2 

Power Wire............................................................... D 

Preface...................................................................... xi 

Punch-down Tool ...................................................5-2 

PWR LED ..............................................................9-1 

PWR LED Does Not Turn On................................9-1 

Rack........................................................................2-1 

Rack 19 Inch .............................................................C 

Rack 482.6mm ..........................................................C 

Rack-mounted Installation Requirements ..............2-1 

Reconnect the Power..............................................8-1 

Related Documentation ............................................ xi 

Removing a Main Chassis Card .............................3-2 

Removing the Fan Module.....................................7-1 

Required Mounting Hardware.................................. D 

Safety Warnings ....................................................... A 

Scalable Platform ...................................................1-2 

Screwdriver ............................................................2-1 

Slots, Main Chassis ...................................................C 

Splitter ....................................................................3-5 

Splitter Cards..........................................................1-2 

Splitter Chassis.......................................................1-2 

Splitter Chassis Card Installation ....................3-4, 3-5 

Splitter Chassis Rear Panel Connections................5-2 

Splitter Chassis Rear Panel Telco-50 Pin 

Assignments ......................................................... G 

Splitter Chassis Telco-50 ..........................................C 

Splitter Chassis Wire Wrapping................................C 

Storage Environment 

IES.........................................................................E 

Surge Protection Circuitry......................................5-1 

SYS LED................................................................9-1 

SYS LED Does Not Turn On.................................9-1 

SYS LED Troubleshooting ....................................9-1 

Taiwanese BSMI A Warning ...................................iii 

Содержание IES-2500

Страница 1: ...IES 2500 Integrated Ethernet Switch Version 1 00 September 2003 User s Guide...

Страница 2: ...yXEL Communications Corporation Published by ZyXEL Communications Corporation All rights reserved Disclaimer ZyXEL does not assume any liability arising out of the application or use of any products o...

Страница 3: ...limits are designed to provide reasonable protection against harmful interference in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed...

Страница 4: ...act of God or subjected to abnormal working conditions Note Repair or replacement as provided under this warranty is the exclusive remedy of the purchaser This warranty is in lieu of all other warran...

Страница 5: ...com www europe zyxel com WORLDWIDE sales zyxel com tw 886 3 578 2439 ftp europe zyxel com ZyXEL Communications Corp 6 Innovation Road II Science Based Industrial Park Hsinchu 300 Taiwan support zyxel...

Страница 6: ......

Страница 7: ...Chassis Installation 2 1 2 1 General Installation Instructions 2 1 2 2 Rack mounted Installation Requirements 2 1 2 3 Mounting the IES 2500 Chassis on a Rack 2 1 Chapter 3 Card Installation 3 1 3 1 In...

Страница 8: ...ling the Fan Module 7 1 Chapter 8 Power Maintenance 8 1 8 1 Procedure to Change an IES 2500 Power Fuse 8 1 8 2 Procedure to Reconnect the Power 8 1 Chapter 9 Hardware Troubleshooting 9 1 9 1 The SYS o...

Страница 9: ...g Splitter Chassis Card Thumbscrews 3 4 Figure 3 9 Loosening Splitter Chassis Card Thumbscrews 3 5 Figure 3 10 Removing a Splitter Chassis Card 3 5 Figure 4 1 IES 2500 Front Panel Telco 50 Connections...

Страница 10: ...ist of Tables Table 9 1 SYS LED Troubleshooting 9 1 Table 9 2 ALM LED Troubleshooting 9 1 Table 9 3 DSL LED Troubleshooting 9 2 Table 9 4 Voice Troubleshooting 9 2 Table 9 5 WAN Link Troubleshooting 9...

Страница 11: ...itter chassis and its cards The IES 2500M is the IES 2500 main chassis The IES 2000ST is the IES 2000 splitter chassis with Telco 50 connectors The IES 2000SW is the IES 2000 splitter chassis with wir...

Страница 12: ......

Страница 13: ...Hardware Overview I Part I Hardware Overview This part introduces the Integrated Ethernet Switch and gives some application examples...

Страница 14: ......

Страница 15: ...perfect DSL provider solution The IES 2500 platform allows for convenient management and support of various DSL technologies It has the ability to hold a maximum of six VDSL line cards without a mana...

Страница 16: ...twork Integrated Services Digital Network switch Hot Swappable DSL Line Cards The IES 2500 uses hot swappable DSL line cards Hot Swappable Splitter Cards The IES 2500 uses hot swappable splitter cards...

Страница 17: ...pport more subscribers 1 4 Applications The following sections describe example applications for the IES 2500 This figure gives an example overview Figure 1 3 Application Overview Example 1 4 1 IP DSL...

Страница 18: ...tenant unit MTU that leverages the existing phone line wiring to provide Internet access to subscribers in the building A subscriber connects a computer to the phone line in a unit using an ADSL mode...

Страница 19: ...IES 2500 User s Guide Card Installation 1 5 Figure 1 5 MTU Application Example...

Страница 20: ......

Страница 21: ...Installation II Part II Installation This part describes how to install the IES 2500 chassis and cards...

Страница 22: ......

Страница 23: ...chassis Step 6 Refer to the chapter on power connections for instructions on making power connections and turning on the IES 2500 2 2 Rack mounted Installation Requirements Make sure the rack will sa...

Страница 24: ...already attached to the chassis on one side of the rack lining up the screw holes on the bracket with the screw holes on the side of the rack see the figure shown next Step 2 Use the screwdriver to i...

Страница 25: ...ard is necessary Step 1 Grasp the center of the front panel of the card with one hand and place the other hand under the card to support it Step 2 Insert the card halfway into the slot and spread the...

Страница 26: ...sconnect all cables from the card Step 2 Loosen the two thumbscrews Step 3 Pull the two ejector levers firmly until the front of the card is clear of the chassis Pull the ejector levers until they are...

Страница 27: ...IES 2500 User s Guide Card Installation 3 3 IES 2500 Figure 3 4 Loosening Main Chassis Card Thumbscrews IES 2500 Figure 3 5 Opening the Ejector Levers IES 2500 Figure 3 6 Removing a Main Chassis Card...

Страница 28: ...to install a splitter card in the splitter chassis Step 1 Install the splitter card in the same slot number on the splitter chassis as the corresponding line card in the main chassis the management sw...

Страница 29: ...the cable from the card Step 2 Loosen the two thumbscrews Step 3 Grasp the handles on the front panel of the card and start to pull the card out Step 4 After you have the card partially out of the ch...

Страница 30: ......

Страница 31: ...Connections III Part III Connections This part describes how to make the front panel connections connect the IES 2500 to a Main Distribution Frame MDF and connect the power...

Страница 32: ......

Страница 33: ...the optional Telco 50 cable to connect the DSL line card s front panel Telco 50 connector to the corresponding splitter card s front panel Telco 50 connector See the hardware specifications in the ap...

Страница 34: ...IES 2500 User s Guide 4 2 Front Panel Connections Figure 4 2 IES 2500 Front Panel Telco 50 Connections 6 VLC 1124L cards...

Страница 35: ...to the User s Guide of your management switch card for details on how to make the management connections 5 2 MDF Main Distribution Frame An MDF is usually installed between subscribers equipment and...

Страница 36: ...ignal It feeds the DSL signal to the DSL line card and diverts the voice signal to the CO Telco 50 connector or wire wrapping pins on the splitter chassis s rear panel Connect the CO Telco 50 connecto...

Страница 37: ...stall the IES 2500 for data access only No connection from the Telco 50 CO connector is necessary You may connect using an MDF or attach RJ 11 connectors to the non IES 2500 end of the Telco 50 cable...

Страница 38: ...nd user and CO Connections This installation scenario requires three MDFs Please refer to the following figure for the connection schema MDF 1 is the original MDF used for telephone connections only M...

Страница 39: ...2 using a punch down tool Step 6 Connect the upper ports of MDF 2 to the lower ports of MDF 1 using telephone wires Step 7 Connect the upper ports of MDF 1 to the telephone company Step 8 Telephone s...

Страница 40: ...MDF 3 to the upper ports of MDF 2 for those users that want DSL service Users who want telephone service only retain the original connection from the top port of MDF 2 to the bottom port of MDF 1 Step...

Страница 41: ...appropriate power source Keep the IES 2500 power switch in the OFF position until you come to procedure for turning on the power 6 2 Power Connections The IES 2500 power connection and power switch ar...

Страница 42: ......

Страница 43: ...Maintenance IV Part IV Maintenance This part describes how to change the IES 2500 fuses and fan module It also gives troubleshooting instructions...

Страница 44: ......

Страница 45: ...dule The IES 2500 fan module is at the left on the front panel of the main chassis Perform the following procedure to remove the fan module in order to change a fan fuse or the fan module Step 1 Loose...

Страница 46: ...IES 2500 User s Guide 7 2 Fan Maintenance Figure 7 2 Removing the IES 2500 Fan Module Figure 7 3 IES 2500 Fan Fuses Fuses...

Страница 47: ...Use a flat head screwdriver or similar tool to gently pry the power fuse holder out of the power receptacle Step 4 Replace any fuses that are burnt out see the hardware specifications in the appendix...

Страница 48: ......

Страница 49: ...tch card are when the management switch card s voltage or temperature is outside of the normal range The ALM alarm LEDs on the DSL line cards light when the card is overheated and or voltage readings...

Страница 50: ...ne speed is consistent between the IES 2500 side and the CPE Customer Premise Equipment side 9 If your line quality is low you may need to select a slower line speed for both the IES 2500 and CPE side...

Страница 51: ...ine if there is a wiring problem If the connection is good the telephone will return a dial tone Letters in the figure shown next indicate the systematic tests to be done Suppose you re using installa...

Страница 52: ...e is no dial tone then the problem is between MDF 1 and MDF 2 Check the telephone wire and connections between MDFs 1 and 2 C Disconnect the Telco 50 cable from the splitter chassis Telco 50 CO connec...

Страница 53: ...r E Reconnect the Telco 50 cable to the splitter chassis Telco 50 USER connector Connect a telephone to a lower port of MDF 3 If there is no dial tone then the problem is between the splitter chassis...

Страница 54: ......

Страница 55: ...Appendices and Index V Part V Appendices and Index This part includes appendices and an index...

Страница 56: ......

Страница 57: ...hock from lightning Always disconnect all telephone lines from this device before servicing or disassembling Fuse Warning Replace a fuse only with a fuse of the same type and rating Fan Module Warning...

Страница 58: ......

Страница 59: ...cards You can use 5 ADSL cards with one Management Switch Card MSC or use 6 VLC1124L line cards The IES 2000ST rear panel has six pairs of Telco 50 connectors that correspond to the splitter cards Co...

Страница 60: ...00 Power Cord 18 or larger AWG American Wire Gauge is a measurement system for wire that specifies its thickness As the thickness of the wire increases the AWG number decreases Power Consumption This...

Страница 61: ...connectors on the IES splitter chassis rear panel The pin assignments for the IES splitter chassis with wire wrapping pins are the same as the ones shown for the Telco 50 connectors Note that the USER...

Страница 62: ...the hardware Telco 50 connectors Chart 9 Hardware Telco 50 Connector Port and Pin Numbers PORT NUMBER PIN NUMBER PORT NUMBER PIN NUMBER 1 25 50 13 13 38 2 24 49 14 12 37 3 23 48 15 11 36 4 22 47 16 10...

Страница 63: ...hock A Fan Fuse 7 1 Fan Maintenance 7 1 Fan Module 7 1 Fan Module Warning A FCC iii FCC Warning iii Features 1 2 Front Panel 1 1 Fuse Ratings D Fuse Warning A General Syntax Conventions xi Glossary an...

Страница 64: ...Module 1 2 Power Wire D Preface xi Punch down Tool 5 2 PWR LED 9 1 PWR LED Does Not Turn On 9 1 Rack 2 1 Rack 19 Inch C Rack 482 6mm C Rack mounted Installation Requirements 2 1 Reconnect the Power 8...

Страница 65: ...2 Telephone Wire D Temperature E Testing In house Wiring 9 4 Trademarks ii Turn on the Power 6 1 8 1 USER C 5 3 5 5 5 6 USER Telco 50 Connectors G Voice Troubleshooting 9 2 WAN Link Troubleshooting 9...

Отзывы: