INSTALLATION INSTRUCTIONS FOR 

ZN1201, ZF1201, Z1201-XH, AND Z1201-XB 

WATER CLOSET SYSTEMS 

 

 

Zurn Industries, LLC

 

|

 

Specification Drainage Operation 

 

 

 

1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929 

Rev. 

 

In Canada | 

Zurn Industries Limited                                                                                                                  

Date: 

04/13/2018 

 

3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292

 

C.N. No. 

139851 

 

www.zurn.com 

Form # 

C51 

Page

 4 of 5 

 

11. Prep for finished wall. Fasten the (4) threaded rods 

from the finish bag into the faceplate, using the (4) jam 
nuts to tighten the studs down.  Each rod extends 5/8 
[16] past the closet bowl flange (see 

Figure 11a

).   

 

-  For ZF1201, see 

Figure 11b

-  For ZN1201 & Z1201-XH/XB, see 

Figure 11c

 

Note: 

If the studs are too long they will bottom out 

in the finishing cap nut, preventing proper gasket 
compression which may result in leakage.

 

 

Note:

 For more installation instructions for Z1201-

XB, see the instruction sheet that is inside the 
P1201-XB box. 

 

 

 

 

        

 

12. Slide plastic stud protectors onto the threaded rods.        

See 

Figure 12

 

 

13. Perform 10-ft head pressure test and/or other testing 

required by your local plumbing code. 

 

                  

 

14. Finished wall should be installed.  Ensure appropriate 

size opening is made for coupling.   

 

For 

EZ-Set

TM

 Coupling

 hole sizing, see 

Figure 14

15. Finish Coupling Preparation: 

 

a.  Standard, -CS, and –CC Couplings:

 Remove the 

protective sleeve (see 

Figure 10d

). Ensure coupling 

extends 5/16 [8] from finished wall (see 

Figure 10c

).  

Knock out the test cap with a hammer and deburr 
sharp edges. See 

Figure 15a

.

 

 
b. 

EZ-Set

TM

 Coupling:

 Remove the protective sleeve 

(see 

Figure 10d

). Hang the EZCUTGUIDE 

(purchased separately) (see 

Figure 15b

).  Using an 

oscillating multi-tool with flush cut blade (see 

Figure 

15c

), remove the test cap and excess coupling 

length.  Deburr sharp edges. 

 

  Remove EZCUTGUIDE.  
 
Prep the coupling end and flange, following PVC 

Cement manufacturer’s instructions.  Glue flange to 
pipe with “TOP” properly aligned. See 

Figure 15d

.                

 
 
 

                            

 

 

                 

 

Figure 11b

 

Figure 11c

 

Finished 

Close

Figure 11a

 

Stud 

Protect

or

 

Threaded 

Rod

 

Figure 14

 

Figure 15a

 

EZCutGuid

Threaded 

Rods 

Cut Flush 
With Wall 

Finished 

Figure 15b

 

Figure 15c

 

Figure 15d

 

Figure 12

 

Содержание ZN1201

Страница 1: ...ng holes Secure the 4 ø 13 bolts from 66955 332 9 hardware bag using a torque wrench 25 35 lb ft of torque For ZF1201 see Figure 3a For ZN1201 and Z1201 XH XB see Figure 3b 4 For ZN1201 and Z1201 XH XB To adjust the rough in height loosen the feet bolts see Figure 4a and set the desired height adding additional height for tiling where required Secure bolts using a torque wrench 25 35 lb ft of torq...

Страница 2: ... Figure 5d 6 For ZF1201 and Z1201 XH XB Secure the rear anchor assembly to the fitting using the instructions and hardware provided Ensure the anchor foot sits level on the floor and nuts are tightened For ZF1201 see Figure 6a For Z1201 XH XB see Figure 6b For ZN1201 There is not a rear anchor assembly for the ZN1201 See Figure 6c 7 Align the carrier with the waste line Mark locations on the floor...

Страница 3: ...ages the o ring and begins to resist Using a coupling wrench Z1200 CPLG WRNCH 3 purchased separately continue to turn the coupling into the o ring to create a water tight seal See Figure 10a and Figure 10b Adjust the coupling to extend 5 16 from the finished wall see Figure 10c Ensure the coupling threads are protected from debris adhesion to allow adjustment after the wall is in place If the coup...

Страница 4: ... stud protectors onto the threaded rods See Figure 12 13 Perform 10 ft head pressure test and or other testing required by your local plumbing code 14 Finished wall should be installed Ensure appropriate size opening is made for coupling For EZ SetTM Coupling hole sizing see Figure 14 15 Finish Coupling Preparation a Standard CS and CC Couplings Remove the protective sleeve see Figure 10d Ensure c...

Страница 5: ...ater closet outlet horn See Figure 17 18 Peel off removable backing liner from the opposite side of the gasket and hang the water closet onto the threaded rods Ensure Neo Seal gasket seals to the coupling See Figure 18 19 Assemble a fiber washer and cap nut onto each rod and hand tighten Secure closet with an additional half turn using a wrench on each nut to complete the installation See Figure 1...