INSTALLATION INSTRUCTIONS FOR
ZN1201, ZF1201, Z1201-XH, AND Z1201-XB
WATER CLOSET SYSTEMS
Zurn Industries, LLC
|
Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
Rev.
B
In Canada |
Zurn Industries Limited
Date:
04/13/2018
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
C.N. No.
139851
www.zurn.com
Form #
C51
Page
2 of 5
5. Standing the assembly upright, loosen the faceplate
bolts to adjust the waste line height and pitch as
required. Re-secure bolts using a torque wrench (25-
35 lb-ft of torque).
•
For ZN1201 & Z1201-XH/XB:
- For fitting in the lowest position, see
Figure 5a
.
- For fitting in the highest position, see
Figure 5b
.
•
For ZF1201:
- For fitting in the lowest position, see
Figure 5c
.
- For fitting in the highest position, see
Figure 5d
.
6.
For ZF1201 and Z1201-XH/XB:
Secure the rear anchor assembly to
the fitting using the instructions and
hardware provided. Ensure the anchor
foot sits level on the floor and nuts are
tightened.
- For ZF1201, see
Figure 6a
.
- For Z1201-XH/XB, see
Figure 6b
.
For ZN1201:
There is not a rear anchor assembly for
the ZN1201. See
Figure 6c
.
7. Align the carrier with the waste line.
Mark locations on the floor for
anchoring studs.
- For ZF1201, see
Figure 7a
.
- For Z1201-XH/XB, see
Figure 7b
.
- For ZN1201, see
Figure 7c
.
8. Prep the floor for concrete anchors and
place the carrier back into position. Lag
down the feet using min
ø
13
to max
ø
16
anchors (supplied by others).
- For ZF1201, see
Figure 8a
.
- For Z1201-XH/XB, see
Figure 8b
.
- For ZN1201, see
Figure 8c
.
9. Using the o-ring seal and lubricant bag, ensure the o-
Figure 5a
Figure 5b
Figure 5c
Figure 5d
Figure 6a
Figure 6b
Figure 7a
Figure 7b
Figure 8a
Figure 8b
Figure 6c
Figure 7c
ZF1201
ZN1201
Z1201-XH/XB
ZF1201
ZN1201
Z1201-XH/XB
Figure 8c
ZF1201
ZN1201
Z1201-XH/XB