Testing Procedures

2

WILKINS, a ZURN  company

1747 Commerce Way, Paso Robles, CA 93446 Phone:805/238-7100 Fax:805/238-5766

a              company

®

®

MODEL 450 DOUBLE CHECK VALVE ASSEMBLY

Equipment Required: Differential pressure gauge test kit.

TEST NO. 1 - TIGHTNESS OF #1 CHECK VALVE

REQUIREMENT:

The static pressure drop across check valve #1 shall be at least 

1.0 psid. If test cock #3 is not at the highest point of the check 

valve body, then a vertical tube must be installed on test cock #3 

so that it rises to the top of the check valve body.

PROCEDURE:

1. Slowly open all 4 test cocks to remove any foreign material    

  and attach fittings.

2. Attach hose from the high side of the test kit to the #2 test    

  cock.

3. Open test cock #2 and bleed all air from the hose and gauge  

  by opening the high side bleed needle valve. Close high side  

  bleed needle valve. If a tube is attached to test cock #3,  

 

    open test cock #3 to fill the tube. Close test cock #3. 

  Close #2 shut-off valve then close the #1 shut-off valve.

4. Hold gauge at same level as test cock #3 or water level in 

  tube. Slowly open test cock #3. Record the static pressure

    

 

drop across check valve #1 after gauge reading stabilizes

 

 

and water stops running out of test cock #3.

5. Close all test cocks, open shut-off valve #1 and remove test   

  equipment.

TEST NO. 2 - TIGHTNESS OF #2 CHECK VALVE

REQUIREMENT:

The static pressure drop across check valve #2 shall be at least 

1.0 psid. If test cock #4 is not at the highest point of the check 

valve body, then a vertical tube must be installed on test cock #4 

so that it rises to the top of the check valve body.

PROCEDURE: 

1. Attach hose from the high side of the test kit to the #3 test cock.

2. Open test cock #3 and bleed all air from the hose and gauge  

  by opening the high side bleed needle valve. Close high  

 

  side bleed needle valve. If a tube is attached to test cock    

  #4, open test cock #4 to fill the tube. Close test cock #4.  

 

  Close #1 shut-off valve.

3. Hold gauge at same level as test cock #4 or water level in    

  tube. Slowly open test cock #4. Record the static pressure 

  drop across check valve #2 after gauge reading stabilizes 

  and water stops running out of test cock #4.

4. Close all test cocks, slowly open shut-off valve #1 & #2 and   

  remove test equipment.

HIGH SIDE HOSE

LOW SIDE HOSE

BY PASS HOSE

LOW SIDE BLEED

NEEDLE VALVE

 

(behind body)

HIGH SIDE BLEED

NEEDLE VALVE

(behind body

)

BLEED TUBE

FILTER

S

#1 TEST COC

K

#2 TEST COC

K

#2 SHUT-OFF

VALVE

#1 SHUT-OFF

VALVE

#4 TEST COC

K

#3 TEST COC

K

Содержание WILKINS 450

Страница 1: ...e adequate space around the installed unit so that the test cocks will be accessible for testing and servicing 3 Install valve at least 6 inches above surrounding flood level 4 Always consult local codes for installation methods approvals and guidance PLACING THE DEVICE IN SERVICE 1 Start with both shut off valves closed Slowly open the inlet shut off valve until the backflow preventer is complete...

Страница 2: ...valve 1 after gauge reading stabilizes and water stops running out of test cock 3 5 Close all test cocks open shut off valve 1 and remove test equipment TEST NO 2 TIGHTNESS OF 2 CHECK VALVE REQUIREMENT The static pressure drop across check valve 2 shall be at least 1 0 psid If test cock 4 is not at the highest point of the check valve body then a vertical tube must be installed on test cock 4 so t...

Страница 3: ...he back of the check assembly See Check Assembly illustra tion Separate the seal retainer from the assembly to expose the seal ring 8 Inspect the seal ring for cuts or embedded debris If the reverse side of the seal is unused the seal ring can be inverted and used temporarily until a new seal is obtained Inspect seat o ring and replace if cut or damaged in any way 9 Inspect valve cavity and seatin...

Страница 4: ...c testing according to WILKINS specifications and prevailing governmental industry standards and codes and upon following these installation instructions Failure to do so releases WILKINS of any liability that it might otherwise have with respect to that device Such failure could also result in an improperly functioning device PROBLEM POSSIBLE CAUSES CORRECTIVE ACTION 1 LEAKING CHECK VALVES 1 Debr...

Отзывы: