background image

PAGE 2 OF 4

ZURN INDUSTRIES, LLC 

5900 Elwin Buchanan Drive, Sanford, NC U.S.A. 27330, Ph. 1-800-997-3876, Fax 919-775-3541

In Canada: 

ZURN INDUSTRIES LIMITED 

7900 Goreway Drive, Unit 10, Brampton, Ontario L6T 5W6, Ph. 905-405-8272, Fax 905-405-1292

Rev. A 

Date: 6/25/2018 

C.N. No. SAN008311  

Prod. | Dwg. No. 

CF1203

1.Remove the flange (2), then thread nut (5) and fiber gasket    

(4) down as far as possible. Place the housing gasket (3)    

on top of fiber gasket and nut.

2.Apply teflon tape to the threaded portion of tailpiece (7) and    

thread into body (6).

3. Apply putty to the underside of the flange (2). Push the pop-  

up assembly through the bottom of the lavatory  sink. Screw  

the flange (2) onto the pop-up body (6).

4. Face the pivot hole towards the wall. Pull down on the pop-   

up assembly and tighten the nut (5), fiber gasket (4) and  

 

housing gasket (3). Do not let the pop-up assembly turn  

 

while tightening. Remove the excess plumbers putty from    

the flange.

5. Place gasket (10) into nut (11). Place nut (11) over rod and    

rod ball (9). Place seat (8) in rod ball hole. Tighten nut (11)    

hand tight. The pop-up stopper (1) can be installed two  

 

different ways: (A) removable and (B) non-removable. See    

stopper drawing " A" and "B" on opposite page. Position  

 

stopper into body (6).

6. Place clip (12) over a hole in the metal strap (13). Insert the   

horizontal rod (9) through both the hole in the strap (13)  

 

and clip (12). You can bend the strap for travel adjustment.

7. Place the lift rod (15) down through the hole in the faucet    

and then the strap (13). Set the desired height of push rod    

and tighten the thumb screw (14).

METAL POP-UP INSTALLATION

___________________________

 INSTALLATIONS INSTRUCTIONS

Item

Description

1

STOPPER

2

FLANGE

3

HOUSING GASKET

4

FIBER GASKET

5

NUT

6

BODY

7

TAILPIECE

8

SEAT

9

ROD & BALL

10

GASKET

11

NUT

12

CLIP

13

STRAP

14

THUMB SCREW

15

LIFT ROD

Содержание Sierra Z7440-XL-CST Series

Страница 1: ...nsult the mounting surface manufacture for their recommendation of sealant From underneath the sink position bracket on mounting studs and attach the hex nuts Tighten hex nuts 3 If faucet includes pop up or grid drain refer to next page for pop up assembly installation 4 Connect left inlet tube to hot water supply and right inlet tube to cold water supply CAUTION Care should be taken not to kink t...

Страница 2: ...nd housing gasket 3 Do not let the pop up assembly turn while tightening Remove the excess plumbers putty from the flange 5 Place gasket 10 into nut 11 Place nut 11 over rod and rod ball 9 Place seat 8 in rod ball hole Tighten nut 11 hand tight The pop up stopper 1 can be installed two different ways A removable and B non removable See stopper drawing A and B on opposite page Position stopper into...

Страница 3: ...mbly down through lavatory sink 4 Install housing gasket 2 flat gasket 3 and nut 4 Tighten nut 5 Remove excess putty from flange 1 1 Remove aerator and open valve to mixed position 2 Turn water on for 1 minute 3 Check for leaks under the sink 4 Shut off faucet and replace aerator NOTE TO INSTALLER When using vandal proof aerator VP or flow control FC keep the installation key fixed under sink or i...

Страница 4: ...is loose Water way may leak from aerator and appear under sink Tighten aerator LIMITED WARRANTY All goods sold hereunder are warranted to be free from defects in material and factory workmanship for a period of three 3 years from the date of purchase We will replace at no cost goods that prove defective provided we are notified in writing of such defect and the goods are returned to Zurn Industrie...

Отзывы: