Chapter 2 Installing the ZXSDR R8119
Figure 2-14 Marking Holes
2.
On the removed ceiling, drill two mounting holes and one network cable hole,
see
Figure 2-15
.
Figure 2-15 Hole Template of the Removable Ceiling Board
1.
Installation hole of the
network cable
2.
Installation hole of
the two-point hanging
board
Caution!
The network cable hole must be drilled in accordance with the size specified on the
hole template. If the hole size is smaller than that of the template hole, the network
cable will be stuck when the ZXSDR R8119 is dismounted.
2-13
SJ-20150805085318-002|2016-08-18 (R1.3)
ZTE Proprietary and Confidential