![Zte ZXSDR R8119 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/zte/zxsdr-r8119/zxsdr-r8119_hardware-installation_941785014.webp)
ZXSDR R8119 Hardware Installation
Figure 2-5 Securing the Two-Point Mounting Plate to the L—shaped Bracket
2.
On the wall, mark locations for drilling holes based on the hole positions of the
L-shaped bracket, and drill four holes at the marks with an electric drill. The holes
must be at least 55 mm deep, see
Figure 2-6
.
Figure 2-6 Drilling Holes
3.
Hammer the expansion tubes into the holes with a rubber hammer, see
Figure 2-7
.
2-6
SJ-20150805085318-002|2016-08-18 (R1.3)
ZTE Proprietary and Confidential